X17/PRad II ERR

From Pcrewiki
Revision as of 18:04, 27 February 2025 by Pasyuk (talk | contribs)
Jump to navigationJump to search

UDER CONSTRUCTION...

The review will take place May 9, 2025

Review committe

Charge to the review

ERR Report

Agenda

  • 0:0 Executive Session
  • 0:0 General overview of experiments (10 min) Ashot
  • 0:0 PRad II projected results (20 min) Ashot/Weizhi
  • 0:0 X17 projected reach (20 min) Rafo/Tyler
  • 0:0 Overview of the experimental setup, required beam parameters (15 minutes) Ashot/Dipangkar
  • 0:0 Run plan including commissioning (20 min) Ashot/Dipangkar
  • 0:0 HyCal (20 min) Ashot
  • 0:0 PRad Target (20 min) - Xiangdong
  • 0:0 GEM (20 min) - Nilanga
  • 0:0 DAQ, on-line and off-line software, trigger, slow controls (25 min) - Chao
  • 0:0 Experiment configuration layout, pre-installation, and installation schedule (20 min) Bob
  • 0:0 Radiation dose on the calorimeter (15 min) Weizhi
  • 0:0 Run documentation COO, ESAD, RSAD, etc.] (10 min) Eugene
  • 0:0 Staffing of the experiment (shifts, Run coordinators) (15 min) Dipangar
  • 0:0 Path to first publications (10 min) Haiyan
  • 0:0 Executive Session
  • 0:0 Closeout

Materials for ERR

Presentations

Documentation

===Run documentation=== (Eugene)

  • Conduct of Operations (COO)
  • Experiment Safety Assessment Document (ESAD)
  • Radiation Safety Assessment Document (RSAD)
  • Hall B Emergency Response Guidelines (ERG)
  • Pre-run checkout

Operational procedures for non-standard equipment

PRad Target

  • PRad Target ePAS (Xiangdong)
  • PRad Target Operation procedures (Xiangdong)

HyCal

  • HyCal ePAS (Eugene)
  • HyCal Operation procedures (Ashot,Eugene))
  • HyCal Transporter ePAS (Eugene,Krister)
  • HyCal Transporter Operation procedures (Eugene,Krister)

GEM

  • GEM ePAS (Florian)
  • GEM Operation procedures (Nilanga,Florian)

Vacuum Chamber

  • Vacuum Chamber ePAS (Bob)