Difference between revisions of "JPos17 Positron Source and Beam Physics Session"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | ''' | + | '''Accelerator/Beams Plenary (~240 min):''' |
− | :: Overview of Positron Accelerator Facilities | + | :: (40+5) TBD, Overview of Positron Accelerator Facilities |
+ | :: (25+5) TBD, Resuming DESY operations with positrons | ||
+ | :: (25+5) Y. Roblin (JLab), Options for a polarized positron beam at CEBAF (rotating/counterrotating) | ||
+ | :: (25+5) Y. Zhang (JLab), A polarized positron beam for JLEIC | ||
+ | :: (25+5) E. Fanchini (CAEN), PEPPo method for polarized positrons and PEPPo II | ||
+ | :: (25+5) F. Lin (JLab), A dedicated polarized positron injector for CEBAF/JLEIC | ||
+ | :: (25+5) TBD, Positron polarimetry | ||
− | ''' | + | '''Accelerator/Beams Parallel (4 hours = 240):''' |
− | :: | + | :: (20+5) R. Suleiman (JLab), High current polarized electron source |
− | + | :: (20+5) TBD (BNL), Polarized electron accumulation | |
− | :: | + | :: (20+5) J. Guo (JLab), Injection/extraction kickers |
− | + | :: (20+5) TBD (Niowave), High power positron conversion targets | |
− | + | :: (20+5) A. Mikhailichenko (Cornell), Positron collection schemes | |
− | + | :: (20+5) TBD, Diagnostics for Positron Beams | |
− | + | :: (20+5) M. Tiefenback (JLab), Considerations and implications for bipolar operation of CEBAF magnets | |
− | + | :: (20+5) A. Freyberger (JLab), Alternatives for positron production at Jefferson Lab | |
− | :: | + | :: (20+5) W. Brooks (UTFSM), Scheme for producing electrons and positrons in Hall B |
− | |||
− | :: | ||
− | |||
− | :: | ||
− | :: | ||
− | :: M. Tiefenback, Considerations and implications for bipolar operation of CEBAF magnets | ||
− | :: | ||
− | |||
− | |||
− | |||
− | :: W. Brooks, Scheme for producing electrons and positrons in Hall B |
Revision as of 07:54, 9 June 2017
Accelerator/Beams Plenary (~240 min):
- (40+5) TBD, Overview of Positron Accelerator Facilities
- (25+5) TBD, Resuming DESY operations with positrons
- (25+5) Y. Roblin (JLab), Options for a polarized positron beam at CEBAF (rotating/counterrotating)
- (25+5) Y. Zhang (JLab), A polarized positron beam for JLEIC
- (25+5) E. Fanchini (CAEN), PEPPo method for polarized positrons and PEPPo II
- (25+5) F. Lin (JLab), A dedicated polarized positron injector for CEBAF/JLEIC
- (25+5) TBD, Positron polarimetry
Accelerator/Beams Parallel (4 hours = 240):
- (20+5) R. Suleiman (JLab), High current polarized electron source
- (20+5) TBD (BNL), Polarized electron accumulation
- (20+5) J. Guo (JLab), Injection/extraction kickers
- (20+5) TBD (Niowave), High power positron conversion targets
- (20+5) A. Mikhailichenko (Cornell), Positron collection schemes
- (20+5) TBD, Diagnostics for Positron Beams
- (20+5) M. Tiefenback (JLab), Considerations and implications for bipolar operation of CEBAF magnets
- (20+5) A. Freyberger (JLab), Alternatives for positron production at Jefferson Lab
- (20+5) W. Brooks (UTFSM), Scheme for producing electrons and positrons in Hall B