Difference between revisions of "JPos17 Positron Source and Beam Physics Session"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
:: (20+5) TBD (BNL), Polarized electron accumulation => JG Ask Willeke | :: (20+5) TBD (BNL), Polarized electron accumulation => JG Ask Willeke | ||
:: '''(20+5) J. Guo (JLab), Injection/extraction kickers (confirmed)''' | :: '''(20+5) J. Guo (JLab), Injection/extraction kickers (confirmed)''' | ||
− | :: (20+5) TBD (Niowave), High power positron conversion targets | + | :: '''(20+5) TBD (Niowave), High power positron conversion targets (confirmed)''' |
:: (20+5) A. Mikhailichenko (Cornell), Positron collection schemes => JG Invite Alexander | :: (20+5) A. Mikhailichenko (Cornell), Positron collection schemes => JG Invite Alexander | ||
:: (20+5) K. Jordan (JLab), Diagnostics for Positron Beams => VM invite | :: (20+5) K. Jordan (JLab), Diagnostics for Positron Beams => VM invite |
Revision as of 09:42, 3 July 2017
Accelerator/Beams Plenary (~240 min):
- (40+5) TBD, Overview of Positron Accelerator Facilities => JG invite Willeke
- (25+5) TBD, Resuming DESY operations with positrons => JG Ask Arne/IAC
- (25+5) Y. Roblin (JLab), Options for a polarized positron beam at CEBAF (rotating/counter-rotating) (confirmed)
- (25+5) Y. Zhang (JLab), A polarized positron beam for JLEIC (confirmed)
- (25+5) PEPPo method for polarized positrons and PEPPo II (Invited L. Cardman 6/23)
- (25+5) F. Lin (JLab), A dedicated polarized positron injector for CEBAF/JLEIC (confirmed)
- (25+5) TBD, Positron polarimetry => JG ILC positron speaker, Camsonne, Gaskell
Accelerator/Beams Parallel (4 hours = 240):
- (20+5) R. Suleiman (JLab), High current polarized electron source (confirmed)
- (20+5) TBD (BNL), Polarized electron accumulation => JG Ask Willeke
- (20+5) J. Guo (JLab), Injection/extraction kickers (confirmed)
- (20+5) TBD (Niowave), High power positron conversion targets (confirmed)
- (20+5) A. Mikhailichenko (Cornell), Positron collection schemes => JG Invite Alexander
- (20+5) K. Jordan (JLab), Diagnostics for Positron Beams => VM invite
- (20+5) M. Tiefenback (JLab), Considerations and implications for bipolar operation of CEBAF magnets (confirmed)
- (20+5) A. Freyberger (JLab), Alternatives for positron production at Jefferson Lab (Invited A. Freyberger 6/2x)
- (20+5) W. Brooks (UTFSM), Scheme for producing electrons and positrons in Hall B => Ask Arne