Difference between revisions of "2018 Data - Analysis Page"
From Xem2
Jump to navigationJump to searchLine 26: | Line 26: | ||
* SHMS | * SHMS | ||
** NGC efficiency lookup table: [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/317 F2 elog 317] | ** NGC efficiency lookup table: [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/317 F2 elog 317] | ||
− | ** Calorimeter efficiency: [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/287 F2 elog 287] [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/321] | + | ** Calorimeter efficiency: [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/287 F2 elog 287] [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/321 F2 elog 287] |
− | ** Trigger efficiency [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/295] | + | ** Trigger efficiency [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/295 F2 elog 295] |
** Electronic dead time | ** Electronic dead time | ||
** FADC dead time (100 ns)??? | ** FADC dead time (100 ns)??? | ||
* HMS | * HMS | ||
− | ** Cerenkov efficiency [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/300] | + | ** Cerenkov efficiency [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/300 F2 elog 300 ] |
− | ** Calorimeter efficiency [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/300] | + | ** Calorimeter efficiency [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/300 F2 elog 300] |
− | ** Trigger efficiency [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/299] | + | ** Trigger efficiency [https://hallcweb.jlab.org/elogs/E12-10-002+Preparations/299 f2 elog 299] |
** Electronic dead time | ** Electronic dead time | ||
** FADC dead time (100 ns)??? | ** FADC dead time (100 ns)??? | ||
* EMC only | * EMC only | ||
** Isoscalar corrections | ** Isoscalar corrections |
Revision as of 23:27, 3 February 2021
2018 Data: Analysis Summary
Target Information
- Target configuration report
- Note: cryotargets need to subtract window thickness and apply a correction of 0.996 due to length contraction at low temperature
- Target ladder survey
- Note: z position of "raster target" is upstream face. All solid targets have upstream face at same psoition.
- Solid target notes
- Note: I think there was a transcription error for the carbon target. The report says 0.5244 g/cm2. I get 0.5224 g/cm2 from the notes above.
- Beam and target offsets:
- Analysis of SHMS/HMS C data (log entry needed)
- Offsets to put in MC (from email from Abishek)
- x-spec offset = +0.127 cm
- y-spec offset = -0.057 cm
- x-beam offset = (0.073 - x-bpm) cm
- z-target offset = 0.212 cm (carbon target)
- How I get Boron from B4C: [1]
BCM calibration
- Summary from Deb
- Correction for runs 2557-2563 (multiply charge by 1.0115) XEM2 elog 60
Efficiencies and corrections
- Target Boiling
- LH2 target:
- LD2 target:
- SHMS
- NGC efficiency lookup table: F2 elog 317
- Calorimeter efficiency: F2 elog 287 F2 elog 287
- Trigger efficiency F2 elog 295
- Electronic dead time
- FADC dead time (100 ns)???
- HMS
- Cerenkov efficiency F2 elog 300
- Calorimeter efficiency F2 elog 300
- Trigger efficiency f2 elog 299
- Electronic dead time
- FADC dead time (100 ns)???
- EMC only
- Isoscalar corrections