Difference between revisions of "Data Analysis - Timing Windows and Reference Times - Burcu"

From Xem2
Jump to navigationJump to search
(Created page with "The "very" first step in the data analysis is determining two types of cuts and applying them on the raw data. One of them is the reference time cuts to pick the right referen...")
 
Line 1: Line 1:
The "very" first step in the data analysis is determining two types of cuts and applying them on the raw data. One of them is the reference time cuts to pick the right reference time in the presence of multiple hits in the reference time TDC spectrum. The second one is the timing window cuts to select "good" ADC or TDC hit in a given channel for a detector.
+
The "very" first step in the data analysis is to determine two types of cuts and applying them on the raw data. One of them is the reference time cuts to pick the right reference time in the presence of multiple hits in the reference time TDC spectrum. The second one is the timing window cuts to select "good" ADC or TDC hit in a given channel for a detector.
 
==What is a Reference Time?==
 
==What is a Reference Time?==
 
==Reference Time Cut Selection Procedure==
 
==Reference Time Cut Selection Procedure==

Revision as of 10:51, 27 September 2021

The "very" first step in the data analysis is to determine two types of cuts and applying them on the raw data. One of them is the reference time cuts to pick the right reference time in the presence of multiple hits in the reference time TDC spectrum. The second one is the timing window cuts to select "good" ADC or TDC hit in a given channel for a detector.

What is a Reference Time?

Reference Time Cut Selection Procedure

Timing Window Cuts

April2020 HCANA Changes

Timing Window Cut Selection Procedure

Branch Variable Names