Data Analysis - Timing Windows and Reference Times - Burcu
From Xem2
Jump to navigationJump to search
The "very" first step in the data analysis is determining two types of cuts and applying them on the raw data. One of them is the reference time cuts to pick the right reference time in the presence of multiple hits in the reference time TDC spectrum. The second one is the timing window cuts to select "good" ADC or TDC hit in a given channel for a detector.