Difference between revisions of "Minutes - XEM Minutes"

From Xem2
Jump to navigationJump to search
Line 7: Line 7:
 
;Tuesday September 7th, 2021
 
;Tuesday September 7th, 2021
 
:Set up a task list and meeting minutes page on the XEM wiki (THIS ONE!)
 
:Set up a task list and meeting minutes page on the XEM wiki (THIS ONE!)
 +
 
====Current Tasks====
 
====Current Tasks====
Run the XEM model for 5.1 GeV EMC data.
+
;Burcu
 +
:Looking at pi/e- ratios for X>1 data.
 +
:*Decide on Noble Gas Cherenkov gas mix, hopefully for upcoming week
 +
;Casey
 +
: Write-up calibration procedures for XEM hodoscope, and calorimeter.
 +
:* Illustrate the usefulness of the diagnostic plots.
 +
: Run the XEM model for all EMC settings
 +
: Find what is happening to the YTrack= -2.5 blocks pulseInt
 +
: Open the reference time windows for the 2019 data slightly.  Include random hits, which should be removed by good electron cuts.
 +
: Work on tracking in 2018 data.  Pruning algorithm work
 +
:* Ali from Pion_LT running has some scripts / plots to help in this process.
 +
:*Possibly narrow the windows to select just the main peak?
 +
;Dave
 +
EMC ratio anomaly, where it is not yet correct. 
 +
;Abishek
 +
: Working on the point-to-point dependence of the error on acceptance.
 +
: Must add ‘added error’ to all momentum settings.
 +
:*Added error is until the Chi-2 value goes to ~1 per DOF.  This is the ideal value, and this will give us an idea of the point-to-point error associated with the acceptance. **
 +
:* Possibly combine the two settings that have okay ratios (Data/MC) across the acceptance.
 +
Systematic tracking efficiency is hard to pin down.  Rel. Uncert. Comes from Deb’s study from rate dependence. 
 +
;Cameron
 +
 
 +
====Recently Completed====
 +
;Aishek
 +
: Isotopic purity assessment of boron targets
 +
: Carbon target EMC ratio with Dave M's boiling slopes. (still 2% off)
 +
: Looked at the EMC ratios with mc-single-arm detector checks turned off.
 +
;Dave
 +
:Log entry on cryo target density uncertainty
 +
:Look at target boiling difference between Dave Mack and our values.
 +
;Burcu
 +
: Comparison of pi/e- ratio to EMC results.
 +
;Casey
 +
: Set up analysis location on CDAQ machine (XEM-2022).
 +
: Ran the hodoscope calibration and improved the fit range of velocity and cable length difference.
 +
: Looked at possible problems with X>1 calorimeter calibration.
 +
: Checked 2019 kinematicaly forbidden range
 +
;Cameron
 +
: Many, many shifts.
 +
 
 +
 
  
Burcu Work:
 
Not currently working on any analysis as of now:
 
Planning to do: Look at pi/e- ratios for X>1 data.
 
Use Abishek’s information Abishek came up with (using existing data)
 
Decide on Noble Gas Cherenkov gas mix, etc for upcomming week
 
Hopefully avail for next week.
 
Planning to help with analysis tasks:
 
Where she can start
 
Dave Gaskell:
 
*Might get done by near. 
 
Log entry on cryo target density uncertainty. 
 
Not consistent with what Dave has heard in the past.
 
Bill has values like 0.6%, which is starteling
 
Look at target boiling.  Determine difference between Dave Mack and our values.  Don’t know why they should be different.
 
Bill sent data for Dave to play with
 
EMC ratio anomaly, where it is not yet correct. 
 
Nievely use Dave Mack’s boiling value moves in the correct direction, so related.
 
  
Abishek:
 
Working on the point-to-point dependence of the error on acceptance.
 
Acceptance studies – did not include error bars on acceptance studies, and stat. error was ~1.2%
 
Adding error bars, very sensitive to statistical errors. 
 
Must add ‘added error’ to all momentum settings.
 
**Added error is until the Chi-2 value goes to ~1 per DOF.  This is the ideal value, and this will give us an idea of the point-to-point error associated with the acceptance. **
 
** Possibly combine the two settings that have okay ratios (Data/MC) across the acceptance.
 
Systematic tracking efficiency is hard to pin down.  Rel. Uncert. Comes from Deb’s study from rate dependence. 
 
Abishek will be looking at EMC ratio with correct target thickness.  Need to add Boron-11 final value.
 
  
Cameron was on Shift – Did carbon hole centering. 
 
  
Put files on CDAQ machine.
+
===Meeting Minutes===
 +
;Tuesday September 21th, 2021
 +
:Discussed previous week's work

Revision as of 13:37, 21 September 2021

Meeting Information

Meeting Place: Virtual - Bluejeans
Meeting Time: Tuesday, 11:30 EST
Meeting Link: Refer to the weekly reminder email or calendar event for connection information.

Meeting Minutes

Tuesday September 7th, 2021
Set up a task list and meeting minutes page on the XEM wiki (THIS ONE!)

Current Tasks

Burcu
Looking at pi/e- ratios for X>1 data.
  • Decide on Noble Gas Cherenkov gas mix, hopefully for upcoming week
Casey
Write-up calibration procedures for XEM hodoscope, and calorimeter.
  • Illustrate the usefulness of the diagnostic plots.
Run the XEM model for all EMC settings
Find what is happening to the YTrack= -2.5 blocks pulseInt
Open the reference time windows for the 2019 data slightly. Include random hits, which should be removed by good electron cuts.
Work on tracking in 2018 data. Pruning algorithm work
  • Ali from Pion_LT running has some scripts / plots to help in this process.
  • Possibly narrow the windows to select just the main peak?
Dave

EMC ratio anomaly, where it is not yet correct.

Abishek
Working on the point-to-point dependence of the error on acceptance.
Must add ‘added error’ to all momentum settings.
  • Added error is until the Chi-2 value goes to ~1 per DOF. This is the ideal value, and this will give us an idea of the point-to-point error associated with the acceptance. **
  • Possibly combine the two settings that have okay ratios (Data/MC) across the acceptance.

Systematic tracking efficiency is hard to pin down. Rel. Uncert. Comes from Deb’s study from rate dependence.

Cameron

Recently Completed

Aishek
Isotopic purity assessment of boron targets
Carbon target EMC ratio with Dave M's boiling slopes. (still 2% off)
Looked at the EMC ratios with mc-single-arm detector checks turned off.
Dave
Log entry on cryo target density uncertainty
Look at target boiling difference between Dave Mack and our values.
Burcu
Comparison of pi/e- ratio to EMC results.
Casey
Set up analysis location on CDAQ machine (XEM-2022).
Ran the hodoscope calibration and improved the fit range of velocity and cable length difference.
Looked at possible problems with X>1 calorimeter calibration.
Checked 2019 kinematicaly forbidden range
Cameron
Many, many shifts.




Meeting Minutes

Tuesday September 21th, 2021
Discussed previous week's work