2015-08-21 Accelerator Physics Biweekly Report

From Administrative
Jump to navigation Jump to search

CASA Accelerator Physics
Biweekly Report: 08/08/15 - 08/21/15
Sbmitted by: Todd Satogata


Todd Satogata

    Previous two weeks (Aug 10-21)
  • CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric Thompson)
  • ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning
  • ADMIN: IPAC'15 proceedings finalization; COOL'15 program work
  • MEIC: Gear-changing summary report contribution; beam-beam model development
  • ODU/MEIC: Continue bunch-splitting simulations, education with Randy
  • ODU: NNSA funding proposal development (biweekly telecon)
  • VACATION: 8/10(pm), 8/12, 8/14(am)
    Next two weeks (Aug 24-Sep 4)
  • CEBAF: ORFP editing; BTeam; fopt optics tuning development (w/Eric Thompson); Hall D weekly meeting
  • ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning (BNL Sep 4-11)
  • ADMIN: JACoW documentation development (Board of Directors)
  • MEIC: Continue beam-beam model development
  • ODU/MEIC: Continue bunch-splitting simulations, education with Randy
  • ODU: NNSA funding proposal development (biweekly telecon)
  • FMLA: 08/28


Alex Bogacz

    Previous two weeks (Aug 10-21)
  • NuFact15 (Aug 10-15)
  • Vacation (Aug 16-21)
    Next two weeks (Aug 24-Sep 4)
  • CEBAF: Check M56=0 lattices from Yves for fall run
  • ER@CEBAF: continue optics longitudinal match, extraction considerations


Dave Douglas

    Previous two weeks (Aug 10-21)
  • MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp.
  • Project E: Thinking about compressors in new optics, kibitzing to ASML
  • ER@CEBAF: Meetings
  • Other: DOE FWP review for LK Len
    Next two weeks (Aug 24-Sep 4)
  • MEIC: Deliver magnetized beam matching note; finish DIMAD model for dechirp; start writing technote on magnetized arc transport design.
  • LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz chicane); start reconfiguring optis to integrate detector/isotope production.
  • Project E: Possibly start developing diagnostics lines pending guidance; trip planning for September.
  • ER@CEBAF: Meetings, start writing on motivation section
  • Other: PRL Review


Chris Tennant

    Previous two weeks (Aug 10-21)
  • MEIC: magnetized beam transport/matching, including adaption to Tstep and incorporation of Douglas optics for space charge simulation
  • LERF: Continue FEL lattice to CED/LED with Michele Joyce/Theo
  • Bubble Chamber: 5D line to elegant, configured zigzag harp scans for 5 MeV region, shifts awaiting measurement opportunities.
  • ER@CEBAF: Meetings, measurements planning
    Next two weeks (Aug 24-Sep 4)
  • MEIC: Continued magnetized beam transport, start technote documentation
  • LERF: Check FEL lattice in LED
  • Project E: start evaluating momentum aperture of lattice, Touschek impact, compare to Rui's predictions
  • Bubble Chamber: run planning for September, guidance for tuning (e.g. small spot size on radiator)


Alex Castilla

    Previous two weeks (Aug 10-21)
  • Dissertation writing
  • Continue preparations for MEPAS teaching in Nov
    Next two weeks (Aug 24-Sep 4)
  • Dissertation writing
  • Start preparations for MEPAS teaching in Nov


Randy Gamage

    Previous two weeks (Aug 10-21)
  • MEIC: Longitudinal model development
    Next two weeks (Aug 24-Sep 4)
  • MEIC: Longitudinal model development