Todd Satogata
Previous two weeks (Apr 18-29) - OPS: BTeam, RAR, RSR meetings, prep, analysis - OPS: Eric Thompson, continued fopt fits, documentation - JLEIC: Prep bunch splitting paper for IPAC'16, split scans in esme - JACoW: Prep for IPAC16 student judging, JACoW meetings - ER@CEBAF: proposal writing, review slides/paper for Francois - OPS: Review papers/posters for IPAC, Open House prep/training Next two weeks (May 2-13) - IPAC16: Editorial team, student judging, JACoW meetings
Alex Bogacz
Previous two weeks (Apr 18-29) - ER@CEBAF: APS meeting talk/attendance - JLEIC: Booster studies planning, meeting, coordination - ER@CEBAF: Revise pathlength chicane design for 3m magnets Next two weeks (May 2-13) - OPS: Cover BTeam, operational issues - MUONS: Prep NuFact for IPAC'16 - IPAC16: Attendance, space charge networking, poster prep - JLEIC: Booster studies planning, coordination
David Douglas
Previous two weeks (Apr 18-29) - JLEIC cooler: magnetized beam transport; I wrote a little documentation on a simplified linac-to-arc match that seems to help a bit with beam quality preservation - DarkLight: has heated up; sent around initial optics solution and started in on the IR I&C. Have rough solution for upstream end; testing before moving to downstream transport. Met with software and ops folks re LED and connections amongst EPICS, codes, and measurements as used in the ERL. - Cbeta: is heating up; I'm scheduled to help with a couple sections on the CDR - tolerances and commissioning; working with Adam Bartnik on the latter - MSU BES proposal: is in final stages. Geoff thought up an additional section that is being worked Next two weeks (May 2-13) - Cbeta: Continued CDR section writing, start of advising - Darklight: Continued preparation for summer runs, coordination with LED/ops, write TN on optics design - JLEIC Cooler: Writing TNs on magnetized beam transport
Ed Nissen
Previous two weeks (Apr 18-29) - JLEIC Beam-Beam: evaluating initial growth rates for several sets of initial conditions with Guinea Pig - JLEIC: Installed and started learning Synergia - OPS: Completing training Next two weeks (May 2-13) - JLEIC: Continuing to learn Synergia - JLEIC Beam-Beam: Research/discuss modest-energy beam-beam models for comparisons of validity between Guinea Pig and other codes
Chris Tennant
Previous two weeks (Apr 18-29) - Project E: Finished draft note on Touschek analysis - Project E: Reanalyzed ubunch gains for ASML lattice (with new improved code) - JLEIC Cooler: S2E simulations Next two weeks (May 2-13) - Vacation
Randy Gamage
Previous two weeks (Apr 18-29) - JLEIC: esme model development, bunch split optimization - Continue documenting results for thesis, IPAC'16 paper - Vacation (spring break) Next two weeks (May 2-13) - JLEIC: esme model development, bunch split optimization - JLEIC: Continue documenting results, review Todd's split scan results - JLEIC: Start investigation of genetic algorithm split optimization (with Balsa)