Todd Satogata
Previous two weeks (June 27-July 8) - OPS: StayTreat (Jun 28-30) including talk prep/talk, BTeam - ER@CEBAF: continue next steps (optics coordination with BNL) - JLEIC: Document/planning ion injector integration team work - ODU/JLEIC: Start ODU presence Thursdays, Fall class prep start - REU: Continue work with REU student on emittance error analysis - ADMIN: Finish DOE BES proposal funding review - JACOW: InDiCo/SPMS project priorities to CERN, telecon Next two weeks (July 11-July 22) - OPS: BTeam, Hall D fast feedback deck update, RayTrace analysis coding - OPS: DarkLight kibitzing/support - ER@CEBAF: discuss BNL financial, magnet, labor, optics support - ER@CEBAF: prepare PAC presentation (for July 26) - JLEIC: Continue injector/interface configuration documentation - REU: Continue work with REU student, presentation/paper/poster prep - OPS: Start investigation of possible fast ion instability in C100s per StayTreat - ODU: Continue Fall PHYS 231 class prep - Vacation: July 13-15
Alex Bogacz
Previous two weeks (June 27-July 8) - JLEIC: Synergia ramp-up for Booster SC, ramping simulations - OPS: StayTreat (Jun 28-30) - LDRD: Develop/present proposal for Booster SC studies - ADMIN: Invention disclosures review Next two weeks (July 11-July 22) - JLEIC: Booster to Collider ring transfer line development, to JEDi - PERS: Medical leave (Jul 8-11) - ADMIN: Physical Review article review
David Douglas
Previous two weeks (June 27-July 8) - DarkLight: Run preparations - JLEIC Cooler: Advise Chris on merger tracking - Cbeta: Advise on CSR, trim power supplies, costing - ER@CEBAF: meeting, kibitzing - Vacation: Jun 30-July 6 Next two weeks (July 11-July 22) - DarkLight: Run preparations - ER@CEBAF: meeting, kibitzing - Project E: Study on EUV aperture requirements pushed back due to DarkLight, likely until post-Labor Day
Ed Nissen
Previous two weeks (June 27-July 8) - OPS: StayTreat (Jun 28-30) - JLEIC Beam-Beam: Emit growth vs working point/rigidity studies - JLEIC: Synergia ramp-up for Booster SC, ramping simulations - JLEIC: Start cluster installation of Synergia (with Yves) - Vacation (July 1) Next two weeks (July 11-July 22) - JLEIC: Continue cluster installation of Synergia (with Yves) - JLEIC Beam-beam: Long-term Guinea pig simulations - JLEIC Beam-beam: Install COSY infinity to evaluate beam-beam phase space
Chris Tennant
Previous two weeks (June 27-July 8) - JLEIC Cooler: Merger/tracking/S2E development - DarkLight: Support LED lattice finalization, checks - OPS: StayTreat (Jun 28-30) - ADMIN: GBBU simulation advice to Chen Xu of BNL - ER@CEBAF: meeting, kibitzing Next two weeks (July 11-July 22) - Project E: Return to aperture studies (pressure building) - DarkLight: Support lattice and engineering run preparations - ER@CEBAF: meeting, kibitzing
Randy Gamage
Previous two weeks (June 27-July 8) - JLEIC: Continue bunch splitting simulations - JLEIC: Prep/review ODU student seminar (July 14) Next two weeks (July 11-July 22) - JLEIC: Prep/deliver ODU student seminar (July 14) - JLEIC: Writing outlines of initial dissertation chapters - JLEIC: Initial esme simulations of debunch/rebunch with impedance