2016-Jun-24 Biweekly Report

From Administrative
Jump to navigation Jump to search

Todd Satogata

  Previous two weeks (June 13-24)
    - OPS: Pass change support, optics on call, BTeam, StayTreat talk draft
    - JLEIC: Plan/have initial ion injector integration team meeting
    - JLEIC: Write/deliver talk on bunch merge progress at R&D meeting
    - REU: Continue work with REU student on emittance error analysis
    - JACOW: Assist IPAC'17/HB'16 with SPMS problems, BoD meeting notes
    - ER@CEBAF: biweekly meeting, documentation
    - ADMIN: Start DOE BES proposal funding review
    - VACATION: Jun 16-17
  Next two weeks (June 27-July 8)
    - OPS: StayTreat (Jun 28-30) including talk prep/talk, BTeam
    - ER@CEBAF: continue next steps (optics coordination with BNL)
    - JLEIC: Document/planning ion injector integration team work
    - ODU/JLEIC: Start ODU presence Thursdays, Fall class prep start
    - REU: Continue work with REU student on emittance error analysis
    - JACOW: InDiCo/SPMS project priorities to CERN, telecon
    - ADMIN: Finish DOE BES proposal funding review

Alex Bogacz

  Previous two weeks (June 13-24)
    - USPAS: Teaching at Colorado USPAS with Geoff Krafft
  Next two weeks (June 27-July 8)
    - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
    - OPS: StayTreat (Jun 28-30)
    - LDRD: Present/defend proposal for Booster SC studies
    - ADMIN: Invention disclosures review

David Douglas

  Previous two weeks (June 13-24)
    - Cbeta: completing CDR, participating in CDR review
    - DarkLight: optics solutions
    - ER@CEBAF: meeting, kibitzing
  Next two weeks (June 27-July 8)
    - DarkLight: Finalize machine optics, check steering/tuning
    - Project E: May have to finish study on EUV aperture requirements

Ed Nissen

  Previous two weeks (June 13-24)
    - JLEIC Beam-Beam: paper research, reading re beam-beam growth mechanisms
    - JLEIC Beam-Beam: Parameterization of beam-beam growth in energy
  Next two weeks (June 27-July 8)
    - JLEIC Beam-Beam: Emit growth vs working point/rigidity studies
    - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
    - JLEIC: Cluster installation of Synergia (with Yves)

Chris Tennant

  Previous two weeks (June 13-24)
    - JLEIC Cooler: Penner bend merger development
    - JLEIC Cooler: S2E simulations with merger, document and summarize
    - JLEIC Cooler: Diagnostic cases for Vlasov solver
    - ADMIN: Reading up on MARIE for August light source workshop
    - ER@CEBAF: meeting, kibitzing
  Next two weeks (June 27-July 8)
    - Project E: Continued simulations for aperture studies
    - Project E: Continuing to await CRADA

Randy Gamage

  Previous two weeks (June 13-24)
    - USPAS: TA for Alex / Geoff in Colorado USPAS
  Next two weeks (June 27-July 8)
    - JLEIC: Continue bunch splitting simulations
    - JLEIC: Prep/deliver ODU student seminar (July 7)