2016-Mar-04
Jump to navigation
Jump to search
Todd Satogata
Previous two weeks (Feb 22-Mar 4) - Finalized review ODU/JLab paper on GHOST to prepare for publication - OPS: BTeam, tune team prep - OPS: Develop and implement new Hall D slow orbit lock configuration - OPS: Develop new Hall D IHA5C00 matching strategy to improve FFB phases - ADMIN: Follow up with bERLinPro contacts re account disposition - CBeta: collaboration paperwork development and strategizing - ER@CEBAF: biweekly meeting org, proposal writing - JACoW: Discussions with Shane Koscelniak (TRIUMF) re IPAC'18 - ADMIN: Ed Nissen visit, work planning - JLEIC: Simulation workload discussions/meetings Next two weeks (Mar 7-Mar 18) - OPS: BTeam, tune team prep - OPS: Implement new Hall D IHA5C00 matching strategy to improve FFB phases - ER@CEBAF: Francois Meot visit, discussions - OPS: Eric Thompson, continued fopt fits, documentation - JLEIC/ODU: Bunch splitting development with Randy - JLEIC: Investigate code requirements for gear changing simulations - JACoW: Finish COOL'15 talk processing, publish to JACoW; template work - CBeta: continue collaboration paperwork development
Alex Bogacz
Previous two weeks (Feb 22-Mar 4) - JLEIC: Ion Booster design - ER@CEBAF: Arc A chicane layout Next two weeks (Mar 7-Mar 18) - UITF: UITF modeling - JLEIC: Ion Booster chromaticity correction - PERS: Med leave
David Douglas
Previous two weeks (Feb 22-Mar 4) - DarkLight: matching development, flat beam transforms vs solenoids - CBeta: Risk assessment, collaboration paperwork development - Project E: Meetings, meetings, meetings - JLEIC Cooler: matching development with DarkLight, meetings - ER@CEBAF: one meeting, discussions of detailed dipole modeling Next two weeks (Mar 7-Mar 18) - DarkLight: Complete IR optics, start detailing correction systems - CBeta: start sensitivity assessment and support S2E - Project E: Provide feedback on Lattice 3.2 and a patent disclosure, more meetings - JLEIC Cooler: Prep for collaboration meeting - ER@CEBAF: meeting, push to reassess the longitudinal match and impact of field imperfections
Chris Tennant
Previous two weeks (Feb 22-Mar 4) - Project E: more halo map analysis (including head/tail particles) - Project E: more work on ubunching gain, evaluation of new code and limitations of numerical instability - Project E: evaluating elegant Touschek results vs simple numerical model - JLEIC Cooler: s2e with newest set of bunch parameters - JLEIC Cooler: Tstep troubleshooting - JLEIC Cooler: Prep for collaboration meeting Next two weeks (Mar 7-Mar 18) - Project E: complete Touschek analysis - Project E: await details of ASML/DOE meeting (CRADA?!) - JLEIC Cooler: continue s2e: beam quality at cooling solenoid? - JLEIC Cooler: refine model (matching input from Dave) - JLEIC Cooler: ubunching gain analysis on recirculation arc - Write erratum to TN-15-52 concerning (erroneous) emittance values reported when using qsUtility during fall 2015
Randy Gamage
Previous two weeks (Feb 22-Mar 4) - MEIC: esme model development, bunch split optimization - Start documenting results for thesis, IPAC'16 paper Next two weeks (Mar 7-Mar 18) - MEIC: esme model development, bunch split optimization - Continue documenting results for thesis, IPAC'16 paper