Difference between revisions of "2015-08-21 Accelerator Physics Biweekly Report"
Line 46: | Line 46: | ||
<li>ER@CEBAF: continue optics longitudinal match, extraction considerations | <li>ER@CEBAF: continue optics longitudinal match, extraction considerations | ||
</ul> | </ul> | ||
+ | |||
Dave Douglas | Dave Douglas | ||
+ | <ul> | ||
Previous two weeks (Aug 10-21) | Previous two weeks (Aug 10-21) | ||
− | MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp. | + | </ul> |
− | Project E: Thinking about compressors in new optics, kibitzing to ASML | + | <ul> |
− | ER@CEBAF: Meetings | + | <li>MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp. |
− | Other: DOE FWP review for LK Len | + | <li>Project E: Thinking about compressors in new optics, kibitzing to ASML |
+ | <li>ER@CEBAF: Meetings | ||
+ | <li>Other: DOE FWP review for LK Len | ||
+ | </ul> | ||
+ | <ul> | ||
Next two weeks (Aug 24-Sep 4) | Next two weeks (Aug 24-Sep 4) | ||
− | MEIC: Deliver magnetized beam matching note; finish DIMAD model for dechirp; start writing technote on magnetized arc transport design. | + | </ul> |
− | LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz chicane); start reconfiguring optis to integrate detector/isotope production. | + | <ul> |
− | Project E: Possibly start developing diagnostics lines pending guidance; trip planning for September. | + | <li>MEIC: Deliver magnetized beam matching note; finish DIMAD model for dechirp; start writing technote on magnetized arc transport design. |
− | ER@CEBAF: Meetings, start writing on motivation section | + | <li>LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz chicane); start reconfiguring optis to integrate detector/isotope production. |
− | Other: PRL Review | + | <li>Project E: Possibly start developing diagnostics lines pending guidance; trip planning for September. |
+ | <li>ER@CEBAF: Meetings, start writing on motivation section | ||
+ | <li>Other: PRL Review | ||
+ | </ul> | ||
Chris Tennant | Chris Tennant |
Revision as of 14:09, 26 August 2015
CASA Accelerator Physics
Biweekly Report: 08/08/15 - 08/21/15
Sbmitted by: Todd Satogata
Todd Satogata
-
Previous two weeks (Aug 10-21)
- CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric Thompson)
- ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning
- ADMIN: IPAC'15 proceedings finalization; COOL'15 program work
- MEIC: Gear-changing summary report contribution; beam-beam model development
- ODU/MEIC: Continue bunch-splitting simulations, education with Randy
- ODU: NNSA funding proposal development (biweekly telecon)
- VACATION: 8/10(pm), 8/12, 8/14(am)
-
Next two weeks (Aug 24-Sep 4)
- CEBAF: ORFP editing; BTeam; fopt optics tuning development (w/Eric Thompson); Hall D weekly meeting
- ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning (BNL Sep 4-11)
- ADMIN: JACoW documentation development (Board of Directors)
- MEIC: Continue beam-beam model development
- ODU/MEIC: Continue bunch-splitting simulations, education with Randy
- ODU: NNSA funding proposal development (biweekly telecon)
- FMLA: 08/28
Alex Bogacz
-
Previous two weeks (Aug 10-21)
- NuFact15 (Aug 10-15)
- Vacation (Aug 16-21)
-
Next two weeks (Aug 24-Sep 4)
- CEBAF: Check M56=0 lattices from Yves for fall run
- ER@CEBAF: continue optics longitudinal match, extraction considerations
Dave Douglas
-
Previous two weeks (Aug 10-21)
- MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp.
- Project E: Thinking about compressors in new optics, kibitzing to ASML
- ER@CEBAF: Meetings
- Other: DOE FWP review for LK Len
-
Next two weeks (Aug 24-Sep 4)
- MEIC: Deliver magnetized beam matching note; finish DIMAD model for dechirp; start writing technote on magnetized arc transport design.
- LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz chicane); start reconfiguring optis to integrate detector/isotope production.
- Project E: Possibly start developing diagnostics lines pending guidance; trip planning for September.
- ER@CEBAF: Meetings, start writing on motivation section
- Other: PRL Review
Chris Tennant Previous two weeks (Aug 10-21) MEIC: magnetized beam transport/matching, including adaption to Tstep and incorporation of Douglas optics for space charge simulation LERF: Continue FEL lattice to CED/LED with Michele Joyce/Theo Bubble Chamber: 5D line to elegant, configured zigzag harp scans for 5 MeV region, shifts awaiting measurement opportunities. ER@CEBAF: Meetings, measurements planning Next two weeks (Aug 24-Sep 4) MEIC: Continued magnetized beam transport, start technote documentation LERF: Check FEL lattice in LED Project E: start evaluating momentum aperture of lattice, Touschek impact, compare to Rui's predictions Bubble Chamber: run planning for September, guidance for tuning (e.g. small spot size on radiator)
Alex Castilla Previous two weeks (Aug 10-21) Dissertation writing Continue preparations for MEPAS teaching in Nov Next two weeks (Aug 24-Sep 4) Dissertation writing Start preparations for MEPAS teaching in Nov
Randy Gamage Previous two weeks (Aug 10-21) MEIC: Longitudinal model development Next two weeks (Aug 24-Sep 4) MEIC: Longitudinal model development
CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric Thompson) ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning ADMIN: IPAC'15 proceedings finalization; COOL'15 program work MEIC: Gear-changing summary report contribution; beam-beam model development ODU/MEIC: Continue bunch-splitting simulations, education with Randy ODU: NNSA funding proposal development (biweekly telecon) VACATION: 8/10(pm), 8/12, 8/14(am) Next two weeks (Aug 24-Sep 4) CEBAF: ORFP editing; BTeam; fopt optics tuning development (w/Eric Thompson); Hall D weekly meeting ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning (BNL Sep 4-11) ADMIN: JACoW documentation development (Board of Directors) MEIC: Continue beam-beam model development ODU/MEIC: Continue bunch-splitting simulations, education with Randy ODU: NNSA funding proposal development (biweekly telecon) FMLA: 08/28
Alex Bogacz Previous two weeks (Aug 10-21) NuFact15 (Aug 10-15) Vacation (Aug 16-21) Next two weeks (Aug 24-Sep 4) CEBAF: Check M56=0 lattices from Yves for fall run ER@CEBAF: continue optics longitudinal match, extraction considerations
Dave Douglas Previous two weeks (Aug 10-21) MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp. Project E: Thinking about compressors in new optics, kibitzing to ASML ER@CEBAF: Meetings Other: DOE FWP review for LK Len Next two weeks (Aug 24-Sep 4) MEIC: Deliver magnetized beam matching note; finish DIMAD model for dechirp; start writing technote on magnetized arc transport design. LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz chicane); start reconfiguring optis to integrate detector/isotope production. Project E: Possibly start developing diagnostics lines pending guidance; trip planning for September. ER@CEBAF: Meetings, start writing on motivation section Other: PRL Review
Chris Tennant Previous two weeks (Aug 10-21) MEIC: magnetized beam transport/matching, including adaption to Tstep and incorporation of Douglas optics for space charge simulation LERF: Continue FEL lattice to CED/LED with Michele Joyce/Theo Bubble Chamber: 5D line to elegant, configured zigzag harp scans for 5 MeV region, shifts awaiting measurement opportunities. ER@CEBAF: Meetings, measurements planning Next two weeks (Aug 24-Sep 4) MEIC: Continued magnetized beam transport, start technote documentation LERF: Check FEL lattice in LED Project E: start evaluating momentum aperture of lattice, Touschek impact, compare to Rui's predictions Bubble Chamber: run planning for September, guidance for tuning (e.g. small spot size on radiator)
Alex Castilla Previous two weeks (Aug 10-21) Dissertation writing Continue preparations for MEPAS teaching in Nov Next two weeks (Aug 24-Sep 4) Dissertation writing Start preparations for MEPAS teaching in Nov
Randy Gamage Previous two weeks (Aug 10-21) MEIC: Longitudinal model development Next two weeks (Aug 24-Sep 4) MEIC: Longitudinal model development