2016-May-17 Biweekly Report
Jump to navigation
Jump to search
Todd Satogata
Previous two weeks (May 2-13) - JLEIC: Finish/submit bunch splitting paper for IPAC'16 - JACoW: IPAC'16 editing, student poster judging, meetings - JLEIC: Ji Qiang meet @IPAC re beam-beam collaboration - ODU: Suzie Sheehy meet @IPAC re resonance crossing studies - OPS: Open House volunteerism - ER@CEBAF: Proposal preparation Next two weeks (May 16-27) - OPS: Machine restart, RAR, BTeam, daily meetings - OPS: SRF paper writing, StayTreat organization - ER@CEBAF: Proposal writing/organization, meeting - ADMIN: Steve Peggs visit May 18-20, writing - OPS: SULI student prep - OPS: Eric Thompson meetings, documentation, summer prep
Alex Bogacz
Previous two weeks (May 2-13) - JLEIC/Muons: Paper writing for IPAC'16, attend IPAC'16 Next two weeks (May 16-27) - ADMIN: Phys Rev article review - LHEC: Edit ICFA article on "Novel Lattices for LHeC" - USPAS: Lecture prep for summer teaching
David Douglas
Previous two weeks (May 2-13) - DarkLight: I&C layout, LED integration - Project E: Aperture work-through, to be refined with Chris - MSU/ODU BES proposal: wrap-up and delivery - Cbeta: Start detailed CDR writing, S2E discussion w/Chris Mayes Next two weeks (May 16-27) - DarkLight: Continued layout, lattice coordation May 16-18 - Vacation: May 19-23 - Cbeta: Cornell visit May 24-27, CDR writing
Ed Nissen
Previous two weeks (May 2-13) - JLEIC: Continuing to install/learn synergia (postprocessing) - JLEIC: Beam-beam presentation prep, delivery at weekly R&D - JLEIC: Guinea Pig investigations re low-energy modeling fidelity Next two weeks (May 16-27) - JLEIC: Continuing to learn Synergia, get postprocessing working - JLEIC Beam-Beam: Research/discuss modest-energy beam-beam models for comparisons of validity between Guinea Pig and other codes
Chris Tennant
Previous two weeks (May 2-13) - Project E: Finished final TN on Touschek analysis - Project E: Reanalyze ubunch gains ASML lattice (with new code) - JLEIC Cooler: S2E simulations with real front-end distributions - Vacation Next two weeks (May 16-27) - Project E: Orbit correction algorithm definition, development - DarkLight: LERF startup, LED integration - DarkLight: Test CSU orbit correction algorithms at LERF - JLEIC Cooler: Merger design and development
Randy Gamage
Previous two weeks (May 2-13) - Documenting results for thesis, finish IPAC'16 paper - USPAS: Start reviewing class notes/homework for Krafft/Bogacz TA - JLEIC: Start investigation of genetic algorithm split optimization (with Balsa) Next two weeks (May 16-27) - USPAS: Continue reviewing class notes/homework for Krafft/Bogacz TA - JLEIC: Continue investigation of genetic algorithm split optimization (with Balsa) - JLEIC: revisit Todd's split scan results from IPAC'16 paper