2015-Jun-15 Comp. Phys. Biweekly Report

From Administrative
Revision as of 14:15, 20 July 2016 by Anichols (talk | contribs) (Created page with "Yves Roblin *Worked on sidereal variation proposal to produce slides. *PQB work regarding what we install in Hall A (with M. Pitt et al) *Parallelizing the Fast multipole sche...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Yves Roblin

  • Worked on sidereal variation proposal to produce slides.
  • PQB work regarding what we install in Hall A (with M. Pitt et al)
  • Parallelizing the Fast multipole scheme for cooling calculations. Started investigating whether PADAs (http://padas.ices.utexas.edu/software/ ) would be adequate for our needs (Yves, He)
  • CSR LDRD:
    • producing a labor profile for COB june 17 for Fulvia.
    • Fay Hannon has a preliminary estimate of the "option A" injector. We are going to discuss it next meeting.


He

  • Working on bunched cooling LDRD
  • River Huang is now full time on the SLAC field emission problem in waveguides.