2016-Dec-10 Accel. Phys. Biweekly Report

From Administrative
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

  Previous two weeks (Nov 27-Dec 10)
    - ODU PHYS 231 class prep/teaching (MW half-days)
    - JLEIC R&D talk preparation and travel (Nov 28-Dec 1)
    - ODU/JLEIC Randy Gamage mentoring (CERN Blond code)
    - CLAS12 review (Dec 6-7)
    - ODU: Alex Castilla PhD defense (Dec 8)
    - Various recommendation letters
  Next two weeks (Dec 11-Dec 22)
    - ODU PHYS 231 class prep/teaching (Final Dec 12, grading to Dec 18)
    - BTeam/model team prep/participation, CEBAF ops support with Hall D (Dec 13-20)
    - ODU/JLEIC Randy Gamage mentoring (CERN Blond code)
    - IPAC18 SPC1: Meeting prep
    - ADMIN: Rui Li joining group
    - Virtual Accelerator proposal discussions
    - January USPAS class start prep

Alex Bogacz

  Previous two weeks (Nov 27-Dec 10)
    - OOC
    - IPAC abstracts
    - PRST:AB paper review
    - APS: Prep/deliver/analyze survey of publication standards
    - JLEIC: Final pass on JLEIC Booster lattice (start)
    - Start engagement with PERLE/mini-PERLE
    - SBIR reviews
  Next two weeks (Dec 11-Dec 22)
    - JLEIC: Final pass on JLEIC Booster lattice (end)
    - USPAS: Prep lectures on Practical Lattice Design
    - Start evaluation of mini-PERLE optics


David Douglas

  Previous two weeks (Nov 27-Dec 10)
    - Finish tech note 16-046, general insertions for transporting
      magnetized beams to generate CCR/ERL cooling insertion designs
    - SBIR reviews
    - Working through last major bit of ERL cooler (recovery arc),
      working through two-parameter fit for tunes/compaction
  Next two weeks (Dec 11-Dec 22)
    - Continue ERL cooler recovery arc work, hopefully finish fit
      and first-pass optimization
    - More evaluation of Derbenev proposal on longitudinal/transverse
      emittance exchange in cooling system
    - JLEIC: Continue cooler ERL/CCR architecture (have idea for
      present baseline), getting closer to full S2E

Ed Nissen

  Previous two weeks (Nov 27-Dec 10)
   - JLEIC: Continuation of collider beam-beam simulations (with gaps,
     fixed bug that was suppressing growth rates)
   - JLEIC: Continuation of booster injection space charge simulations
   - JLEIC: Start draft of analytic beam-beam items from CERN/JLEIC work
   - IPAC17: Prep and submit abstracts (based on withdrawn NAPAC'16 versions)
  Next two weeks (Dec 11-Dec 22)
   - JLEIC: Continuation of booster injection space charge simulations
   - JLEIC: Running numbers, start draft of analytic beam-beam items from
     CERN/JLEIC work

Chris Tennant

  Previous two weeks (Nov 27-Dec 10)
    - Finalizing DarkLight emittance data analysis
    - Keep writing tech note on DarkLight emittances (growing longer)
    - Prepare slides for diagnostic PIT meeting (Beaminizer ideas/needs)
  Next two weeks (Dec 11-Dec 22)
    - Finish up DarkLight emittance analysis and (hopefully) tech note
    - JLEIC: Initial cooler development (extending/refinining end to end sims)

Randy Gamage

  Previous two weeks (Nov 27-Dec 10)
    - JLEIC: Continue writing outlines of initial dissertation chapters
    - JLEIC: Continue esme simulations of debunch/rebunch with impedance
    - Start preparations for USPAS TA-ship
  Next two weeks (Dec 11-Dec 22)
    - JLEIC: Continue writing outlines of initial dissertation chapters
    - JLEIC: Continue esme simulations of debunch/rebunch with impedance
    - Schedule annual report presentation to committee
    - Continue preparations for USPAS TA-ship