2016-Jun-24 Biweekly Report

From Administrative
Revision as of 16:01, 19 July 2016 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (June 13-24) - OPS: Pass change support, optics on call, BTeam, StayTreat talk draft - JLEIC: Plan/have initial ion injector inte...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

  Previous two weeks (June 13-24)
    - OPS: Pass change support, optics on call, BTeam, StayTreat talk draft
    - JLEIC: Plan/have initial ion injector integration team meeting
    - JLEIC: Write/deliver talk on bunch merge progress at R&D meeting
    - REU: Continue work with REU student on emittance error analysis
    - JACOW: Assist IPAC'17/HB'16 with SPMS problems, BoD meeting notes
    - ER@CEBAF: biweekly meeting, documentation
    - ADMIN: Start DOE BES proposal funding review
    - VACATION: Jun 16-17
  Next two weeks (June 27-July 8)
    - OPS: StayTreat (Jun 28-30) including talk prep/talk, BTeam
    - ER@CEBAF: continue next steps (optics coordination with BNL)
    - JLEIC: Document/planning ion injector integration team work
    - ODU/JLEIC: Start ODU presence Thursdays, Fall class prep start
    - REU: Continue work with REU student on emittance error analysis
    - JACOW: InDiCo/SPMS project priorities to CERN, telecon
    - ADMIN: Finish DOE BES proposal funding review

Alex Bogacz

  Previous two weeks (June 13-24)
    - USPAS: Teaching at Colorado USPAS with Geoff Krafft
  Next two weeks (June 27-July 8)
    - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
    - OPS: StayTreat (Jun 28-30)
    - LDRD: Present/defend proposal for Booster SC studies
    - ADMIN: Invention disclosures review

David Douglas

  Previous two weeks (June 13-24)
    - Cbeta: completing CDR, participating in CDR review
    - DarkLight: optics solutions
    - ER@CEBAF: meeting, kibitzing
  Next two weeks (June 27-July 8)
    - DarkLight: Finalize machine optics, check steering/tuning
    - Project E: May have to finish study on EUV aperture requirements

Ed Nissen

  Previous two weeks (June 13-24)
    - JLEIC Beam-Beam: paper research, reading re beam-beam growth mechanisms
    - JLEIC Beam-Beam: Parameterization of beam-beam growth in energy
  Next two weeks (June 27-July 8)
    - JLEIC Beam-Beam: Emit growth vs working point/rigidity studies
    - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
    - JLEIC: Cluster installation of Synergia (with Yves)

Chris Tennant

  Previous two weeks (June 13-24)
    - JLEIC Cooler: Penner bend merger development
    - JLEIC Cooler: S2E simulations with merger, document and summarize
    - JLEIC Cooler: Diagnostic cases for Vlasov solver
    - ADMIN: Reading up on MARIE for August light source workshop
    - ER@CEBAF: meeting, kibitzing
  Next two weeks (June 27-July 8)
    - Project E: Continued simulations for aperture studies
    - Project E: Continuing to await CRADA

Randy Gamage

  Previous two weeks (June 13-24)
    - USPAS: TA for Alex / Geoff in Colorado USPAS
  Next two weeks (June 27-July 8)
    - JLEIC: Continue bunch splitting simulations
    - JLEIC: Prep/deliver ODU student seminar (July 7)