GTS meeting 12 14 20
Jump to navigation
Jump to search
Work plan for December - January
- Notes:
- LERF is getting its own magnet power supply. We have GTS Gun Solenoid power supply from now on.
- Xelera is in no rush to take back TGun. Gun will stay at JLab as long as there is use for it.
- Plans:
- December: re-connect beamline magnet corrector; re-assemble TGun enclosure; PSS certification.
- January: disconnect turbo and add pinch-off copper tube; beamline magnet racks and trim cards ON; Run 1 mA beam.
- Beam Tests (if 1 mA run is successful):
- TE011 cavity test
- Vent gun HV chamber; remove Kr line; re-activate cathode; ion trapping test.