- Upgrade Glassman Gun PSS interlock chassis (Scott)
- Add vacuum interlock to HV supply (Scott)
Plan B: Install Spellman 225 kV power supply. Did not work because we could not establish remote communication - [1] Plan C: Install spare Spellman power supply (225 kV, 5 mA). Now at UITF, to be moved to GTS.
- Beamline - no bake of beamline: (Mamun and Bubba)
- Replace YAG screens on Viewers 1, 2 and 3
- Replace leaky right-angle valve
- Check ion-trap Gun spool: Iron trap will not fit on PGun becuase of view ports. Instead, investigate using trap with two beamline solenoids.
- Remove Deflecting Cavity and move TE_011 Cavity in its place
Install Electrodynamics Ring Cavity (later)
- Prep Chamber: (Mamun)
- Remove Cs/K source
- Add K source
- Gun HV Chamber: (Carlos)
- Replace Anode
- Replace Pierce geometry
- Upgrade anode HV bias feed-through to 10 kV
- Replace Gun NEG modules with strips
- Laser: (Shukui)
- Re-install 500 MHz green fiber laser
Install new pulse laser (later)