Jan 4, 2024 - CIS Group Meeting
Jump to navigation
Jump to search
General updates
1. Appraisals and 2024 expectations
2. The lab transitions to using ePAS on Monday Jan 8.
- Who has issued an ePAS already? ...who thinks they'll need to issue one?
3. Start wearing your security badges, above waist and photo side out.
- Exception is when it creates a hazardous situation, working with equipment or machinery.
4. Upcoming meetings
- JLAAC (Jan 16-18) - Riad/Moller, Carlos/e-mA, Andriy e+/target
- USPAS (Jan 22..Feb 2) - Gabriel
- JLab Tour Sat 27th, MCC-HallD-TestLab-UITF (Matt, Yan, Joe, volunteer?)
- 11th International Workshop on Mechanisms for Vacuum Arcs (Mar 3-7) (Carlos, Gabriel)
- IPAC24 (May 19-24) - Attendees TBD (Aziz, Kawser, Riad, Andriy, Joe)
5. Paul is asking for Program Deputies for 2024 - CIS should volunteer 1 or 2
- Who has been PD already?
6. Publication status -
- Riad et al., "High precision fundamental physics experiments using compact spin-transparent storage rings of low energy polarized electron beams", Physics Letters B, Volume 843, 2023, 138058, ISSN 0370-2693, https://doi.org/10.1016/j.physletb.2023.138058
- Matt et al., "High figure of merit spin polarized electron sources grown via MOCVD," Appl. Phys. Lett. 123, 222102 (2023), https://doi.org/10.1063/5.0170106
- Greg et al., "A Compton transmission polarimeter for DC and SRF electron photo-injectors", submitted to NIM-A
- Josh et al., "Charge Lifetime Improvement of the CEBAF Spin-Polarized Photogun Using a Biased Anode" ~80% done
- Max et al., "UITF Booster paper" ~50%?
- Riad, quantum computing article ~10%
- Gabriel et al., 200 kV wien filter article
7. CST license renewal, group pool with SRF (contact Shaoheng)
8. UITF R&D program (approximate sequence)
- Jan ~ Restore
- Jan ~ Gun focal length assessment with 12.8 mm active area
- Feb-Mar ~ ODU and UCSB photocathode studies
- Mar-Apr ~ Sb lifetime enhancement
- TBD ~ Nanostructured photocathode studies
- TBD ~ Brock Polarimeter
- TBD ~ GEM studies for Hall A/C
9. SAD jobs
- Musts - FX repair, 18" gun install, Laser room code update, Degrader installation
- Shoulds - RTP HV driver installation, seed laser chassis upgrade,
- Likes - Move HV isolation location
10. Go around the room...
- Status, concerns, beam studies, proposals, etc.