June 17, 2020 - 200 kV gun options
Jump to navigation
Jump to search
- Three options this Fall...
- Take a few days to HV condition
- Try the new small shed electrode in, bake, HV condition
- Replace HV chamber with larger 300 kV HV chamber (TL-1137 or GTS)
- Carlos' slides Media:Evaluating R30 insulator guns for potential use in CEBAF.pptx
- Sajini's slides with details on beam position, emittance, and anode-cathode electric fields for shifted vs tilted anode Media:Angled anode 6_2020_2 vs shifted anode analysis by Sajini.pptx
- Our last planning meeting (January 8, 2020)
- Plan and time line media:200108_plan.docx media:200108_plan.pdf
- Mamun's analysis of SS small shield processed w/ Kr at CEBAF media:200108_Mamun.pptx