MOLLER PQB Meeting June 26, 2024

From Ciswikidb
Jump to navigation Jump to search

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

  • Beam Study Results:
  1. FFB/FF in Hall A: media:2024April_FFBtest_Results.pdf
    1. Check S/H wiring of the Hall A BPMs in BSY
    2. Check FFB ON versus OFF in QWeak data


  • Injector Upgrade Progress:
  1. Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
  2. No progress on Gun replacement
  3. Four out of six MFX solenoids are fixed


  • MOLLER needs more rack space in ISB