NEG coated 2.5 inch OD BPM's
Jump to navigation
Jump to search
200 KV BPM's with NEG coating
ME Design
Assembly Sequence
- Receive can/feedthroughs
- Clean
- Degas
- NEG Coat
- Check feedthroughs
- Assemble feedthroughs
- Serialize
- Leak check cans
- Electrical measurement
- Report K's and center
Electrical Measurements (K's, center, and linearity plots)
- NEG Tube BPM Electrical Summary (see NEG BPM 1-4) - media:UITF_SPM_Summary_9_21.ods
- NEG BPM #1 (IPM2I00) - media:NEG_1_fixed.jpg media:NEG_1_fixed_log.jpg media:NEG_1_1cmx2cm_lower.pdf
- NEG BPM #2 (IPM2I00A) - media:NEG_2_diff_sum.jpg media:NEG_2_log.jpg media:NEG_2_1cmx2cm_upper.pdf, media:NEG_2_1cmx2cm_boresight.pdf
- NEG BPM #3 (Not used)- media:NEG_3_diff_sum.jpg media:NEG_3_log.jpg
- NEG BPM #4 (IPM2I01A) - media:NEG_4.jpg media:NEG_4_log.jpg