Difference between revisions of "GTS meeting 12 06 16"

From Ciswikidb
Jump to navigation Jump to search
Line 25: Line 25:
  
 
* Cathode solenoid magnet coil (update to follow bu Riad)
 
* Cathode solenoid magnet coil (update to follow bu Riad)
 +
 +
* Kevin Jordan is studying the damaged YAG beam line viewer crystals, pictures to follow

Revision as of 10:41, 6 December 2016

  • High voltage processing with improved gun started on November 17th
    • Improvements include:
    • Black (doped alumina) R30 insulator
    • All SS electrodes, barrel polished
    • Shed: Yan's design for <10 MV/m max field
    • NEG modules (6 WP modules on bottom of chamber). Pre-activated in gun chamber, rinsed thoroughly to minimize dust
    • Perforated plate to cover NEGs for minimizing field that can potentially lift up dust
    • We are conditioning with SS DPP dummy wafer
    • Horizontal viewports are now AR coated (both surfaces), measured at <1% reflection at 532 nm
  • This is a link to the GTSLOG latest entry at 336kV in vacuum
  • Mamun and Yan have made great progress with the photocathode preparation chamber'
    • The chamber has many improvements including:
    • Spring Puck retainer on top heater for adjusting the puck-efussion source gap freely,
    • ceramic insulator for biasing the puck
    • Adjustable height mask
    • Second Cs effusion source
    • Additional Thermo Couple to calibrate both heaters
  • Beam line
    • The list have been assembled
    • The components are being played out on the beam line to establish length of needed spool pieces.
    • The plan is to assemble the beam line up to the second valve, this allows running beam with two slits, two viewers, three solenoids and the insertable Faraday Cup
    • Slit assemblies ready 01.jpg, Slit assemblies ready 02.jpg
  • Cathode solenoid magnet coil (update to follow bu Riad)
  • Kevin Jordan is studying the damaged YAG beam line viewer crystals, pictures to follow