Difference between revisions of "GTS meeting 12 06 16"
Jump to navigation
Jump to search
Line 24: | Line 24: | ||
** [[File:Slit assemblies ready 01.jpg]], [[File:Slit assemblies ready 02.jpg]] | ** [[File:Slit assemblies ready 01.jpg]], [[File:Slit assemblies ready 02.jpg]] | ||
− | * Cathode solenoid magnet | + | * Cathode solenoid magnet power supply is ready - handed to us today by DC group. Will submit OSP by the end of this week. |
* Kevin Jordan is studying the damaged YAG beam line viewer crystals, pictures to follow | * Kevin Jordan is studying the damaged YAG beam line viewer crystals, pictures to follow |
Revision as of 10:52, 6 December 2016
- High voltage processing with improved gun started on November 17th
- Improvements include:
- Black (doped alumina) R30 insulator
- All SS electrodes, barrel polished
- Shed: Yan's design for <10 MV/m max field
- NEG modules (6 WP modules on bottom of chamber). Pre-activated in gun chamber, rinsed thoroughly to minimize dust
- Perforated plate to cover NEGs for minimizing field that can potentially lift up dust
- We are conditioning with SS DPP dummy wafer
- Horizontal viewports are now AR coated (both surfaces), measured at <1% reflection at 532 nm
- This is a link to the GTSLOG latest entry at 336kV in vacuum
- Mamun and Yan have made great progress with the photocathode preparation chamber'
- The chamber has many improvements including:
- Spring Puck retainer on top heater for adjusting the puck-efussion source gap freely,
- Ceramic insulator for biasing the puck
- Adjustable height mask
- Second Cs effusion source
- Additional Thermo Couple to calibrate both heaters
- Beam line
- Cathode solenoid magnet power supply is ready - handed to us today by DC group. Will submit OSP by the end of this week.
- Kevin Jordan is studying the damaged YAG beam line viewer crystals, pictures to follow