Difference between revisions of "GTS meeting 12 06 16"

From Ciswikidb
Jump to navigation Jump to search
 
(22 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
* High voltage processing with improved gun  started on November 17th
 
* High voltage processing with improved gun  started on November 17th
 +
*[[File:High voltage processing DPP vs Barrel Polished.png]]
 
** Improvements include:
 
** Improvements include:
## Black (doped alumina) R30 insulator
+
# Black (doped alumina) R30 insulator
## All SS electrodes, barrel polished
+
# All SS electrodes, barrel polished
## Shed: Yan's design for <10 MV/m max field
+
# Shed: Yan's design for <10 MV/m max field
## NEG modules (6 WP modules on bottom of chamber). Pre-activated in gun chamber, rinsed thoroughly to minimize dust
+
# NEG modules (6 WP modules on bottom of chamber). Pre-activated in gun chamber, rinsed thoroughly to minimize dust
## Perforated plate to cover NEGs for minimizing field that can potentially lift up dust
+
# Perforated plate to cover NEGs for minimizing field that can potentially lift up dust
## We are conditioning with SS DPP dummy wafer
+
# We are conditioning with SS DPP dummy wafer
## Horizontal viewports are now AR coated (both surfaces), measured at <1% reflection at 532 nm
+
# Horizontal viewports are now AR coated (both surfaces), measured at <1% reflection at 532 nm
 +
 
 +
 
  
 
* [https://logbooks.jlab.org/entry/3443978 This is a link to the GTSLOG latest entry at 336kV in vacuum]
 
* [https://logbooks.jlab.org/entry/3443978 This is a link to the GTSLOG latest entry at 336kV in vacuum]
 
* Mamun and Yan have made great progress with the photocathode preparation chamber'
 
* Mamun and Yan have made great progress with the photocathode preparation chamber'
 
** The chamber has many improvements including:
 
** The chamber has many improvements including:
** Spring Puck retainer on top heater for adjusting the puck-efussion source gap freely,  
+
# Spring Puck retainer on top heater for adjusting the puck-efussion source gap freely,  
** ceramic insulator for biasing the puck
+
# Ceramic insulator for biasing the puck
** Adjustable height mask  
+
# Adjustable height mask  
** Second Cs effusion source
+
# Second Cs effusion source
** Additional Thermo Couple to calibrate both heaters
+
# Additional Thermo Couple to calibrate both heaters
 +
** Calibrating the top heater [[File:Puck temp cal.jpg]]
 +
 
  
 
* Beam line
 
* Beam line
** The list have been assembled
+
** The slits have been assembled after Bubba had to "lap" them since the gap was not uniform. Below are the measurements done by S&A.
** The components are being played out on the beam line to establish length of needed spool pieces.
+
** The components are being laid out on the beam line to establish length of needed spool pieces.
 
** The plan is to assemble the beam line up to the second valve, this allows running beam with two slits, two viewers, three solenoids and the insertable Faraday Cup
 
** The plan is to assemble the beam line up to the second valve, this allows running beam with two slits, two viewers, three solenoids and the insertable Faraday Cup
** [[File:Slit assemblies ready 01.jpg]], [[File:Slit assemblies ready 02.jpg]]
+
** [[Media:Slits S&A gap measurements.pdf]]
 +
 
 +
 
 +
[[File:Slit assemblies ready 01.jpg]], [[File:Slit assemblies ready 02.jpg]]
 +
 
 +
 
 +
[[File:Slit in cross.jpg]]
 +
 
 +
 
 +
* Cathode solenoid magnet power supply is ready - Today, DC Power group handed it over to us. Will submit OSP by the end of this week.
 +
 
 +
 
 +
* Kevin Jordan is studying the damaged YAG beam line viewer crystals
 +
 
 +
** [[File:Removed damaged YAG side view.jpg]]
 +
 
 +
 
 +
** [[File:Removed damaged YAG front view is bleached.jpg]]
 +
 
 +
 
 +
** [[File:YAG ITVGT01.JPG|1000px|]]
  
* Cathode solenoid magnet coil (update to follow bu Riad)
 
  
* Kevin Jordan is studying the damaged YAG beam line viewer crystals, pictures to follow
+
** [[File:YAG ITVGT01A.JPG|1000px|]]

Latest revision as of 16:54, 6 December 2016

  • High voltage processing with improved gun started on November 17th
  • High voltage processing DPP vs Barrel Polished.png
    • Improvements include:
  1. Black (doped alumina) R30 insulator
  2. All SS electrodes, barrel polished
  3. Shed: Yan's design for <10 MV/m max field
  4. NEG modules (6 WP modules on bottom of chamber). Pre-activated in gun chamber, rinsed thoroughly to minimize dust
  5. Perforated plate to cover NEGs for minimizing field that can potentially lift up dust
  6. We are conditioning with SS DPP dummy wafer
  7. Horizontal viewports are now AR coated (both surfaces), measured at <1% reflection at 532 nm


  1. Spring Puck retainer on top heater for adjusting the puck-efussion source gap freely,
  2. Ceramic insulator for biasing the puck
  3. Adjustable height mask
  4. Second Cs effusion source
  5. Additional Thermo Couple to calibrate both heaters
    • Calibrating the top heater Puck temp cal.jpg


  • Beam line
    • The slits have been assembled after Bubba had to "lap" them since the gap was not uniform. Below are the measurements done by S&A.
    • The components are being laid out on the beam line to establish length of needed spool pieces.
    • The plan is to assemble the beam line up to the second valve, this allows running beam with two slits, two viewers, three solenoids and the insertable Faraday Cup
    • Media:Slits S&A gap measurements.pdf


Slit assemblies ready 01.jpg, Slit assemblies ready 02.jpg


Slit in cross.jpg


  • Cathode solenoid magnet power supply is ready - Today, DC Power group handed it over to us. Will submit OSP by the end of this week.


  • Kevin Jordan is studying the damaged YAG beam line viewer crystals
    • Removed damaged YAG side view.jpg


    • Removed damaged YAG front view is bleached.jpg


    • YAG ITVGT01.JPG


    • YAG ITVGT01A.JPG