Difference between revisions of "November 13, 2013"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
== Test Plans == | == Test Plans == | ||
− | ; Brock cavity | + | ; [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/13528 Brock cavity] |
− | ; Seed laser | + | ; [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/13552 Seed laser] |
== Future Plans == | == Future Plans == |
Revision as of 08:57, 13 November 2013
500 keV Setup
- Polarized Source
- Laser
- High Voltage Overcurrent Faults and Operation
- Beam and Diagnostics
- Beam to PCUP
- Beam Modes
- HVPS calibration
- QE Measurement
- Injector Steering (spot move, Wiens)
- Emittance measurement Rui summary Riad analysis
- Lifetime measurement
Test Plans
Future Plans
- Punchlist Media:500keV_punchlist_v2.xlsx
- Schedule
- AccIAccII
- EGG-like Calendar Media:ACCIACCII.pdf
Scene Preservation
- Slides Media:ScenePreservation.pptx