* High current runs | * High current runs | ||
+ | |||
+ | |||
+ | * Sajini - Differential Orbits study: | ||
+ | :: [[media:Sajini_different_orbits-corrector_settings_11Sept2017.pdf]] | ||
+ | :: [[media:Sajini_different_orbits-corrector_settings_11Sept2017.xlsx]] | ||
Line 9: | Line 14: | ||
# Replace leaky vent valve | # Replace leaky vent valve | ||
# Replace bad ion pump | # Replace bad ion pump | ||
+ | # Activate new photocathode (new puck): 5 mm active area at center or full active area? | ||
* Next Shutdown – December 2017: | * Next Shutdown – December 2017: | ||
# Install TE011 cavity | # Install TE011 cavity |
Latest revision as of 09:42, 11 September 2017
- High current runs
- Sajini - Differential Orbits study:
- Shutdown Plan:
- Install new YAG screen at viewer 3
- Fix existing harp and install 20 µm tungsten wire
- Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
- Replace leaky vent valve
- Replace bad ion pump
- Activate new photocathode (new puck): 5 mm active area at center or full active area?
- Next Shutdown – December 2017:
- Install TE011 cavity