Difference between revisions of "GTS meeting 9 11 17"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
− | * Sajini - | + | * Sajini - Differential Orbits study: |
+ | :: [[media:Sajini_different_orbits-corrector_settings_11Sept2017.pdf]] | ||
+ | :: [[media:Sajini_different_orbits-corrector_settings_11Sept2017.xlsx]] | ||
Latest revision as of 09:42, 11 September 2017
- High current runs
- Sajini - Differential Orbits study:
- Shutdown Plan:
- Install new YAG screen at viewer 3
- Fix existing harp and install 20 µm tungsten wire
- Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
- Replace leaky vent valve
- Replace bad ion pump
- Activate new photocathode (new puck): 5 mm active area at center or full active area?
- Next Shutdown – December 2017:
- Install TE011 cavity