Difference between revisions of "GTS meeting 6 18 18"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
* Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater): | * Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater): | ||
− | # 30 | + | # 30 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation) |
− | + | # 60 minutes Sb deposition (heat cleaned, to be activated today) | |
# 90 minutes Sb deposition (completed) | # 90 minutes Sb deposition (completed) | ||
* CST microwave studio simulations of 300 kV GTS gun: [[media:Gabriel_GTS_CST_18June2018.pdf]] | * CST microwave studio simulations of 300 kV GTS gun: [[media:Gabriel_GTS_CST_18June2018.pdf]] |
Revision as of 14:08, 18 June 2018
- GTS updated plan [1]
- Beamline magnets when Gun Solenoid at 400 Amps [2]
- Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
- 30 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation)
- 60 minutes Sb deposition (heat cleaned, to be activated today)
- 90 minutes Sb deposition (completed)
- CST microwave studio simulations of 300 kV GTS gun: media:Gabriel_GTS_CST_18June2018.pdf