Difference between revisions of "GTS meeting 6 18 18"
Jump to navigation
Jump to search
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | * GTS updated plan | + | * GTS updated plan [https://logbooks/entry/3577754] |
+ | - Beamline magnets when Gun Solenoid at 400 Amps [https://logbooks/entry/3577301] | ||
− | * Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater ): | + | * Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater): |
− | # 30 minutes Sb deposition | + | # 30 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation) |
− | # 60 minutes Sb deposition | + | # 60 minutes Sb deposition (heat cleaned, to be activated today) |
− | # 90 minutes Sb deposition | + | # 90 minutes Sb deposition (completed) |
+ | # 10 minutes Sb deposition (done, presented in IPAC'18) | ||
− | * CST microwave studio simulations of 300 kV GTS gun | + | * CST microwave studio simulations of 300 kV GTS gun: [[media:Gabriel_GTS_CST_18June2018.pdf]] |
Latest revision as of 06:37, 25 June 2018
- GTS updated plan [1]
- Beamline magnets when Gun Solenoid at 400 Amps [2]
- Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
- 30 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation)
- 60 minutes Sb deposition (heat cleaned, to be activated today)
- 90 minutes Sb deposition (completed)
- 10 minutes Sb deposition (done, presented in IPAC'18)
- CST microwave studio simulations of 300 kV GTS gun: media:Gabriel_GTS_CST_18June2018.pdf