Difference between revisions of "Spring SAD 2019"

From Ciswikidb
Jump to navigation Jump to search
Line 31: Line 31:
 
::*ATLIS http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18967
 
::*ATLIS http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18967
  
;<span style="color:#ff0000">Install new anode bias supply controls ISB</span>
+
;<span style="color:#008000">Install new anode bias supply controls ISB</span>
::*Sue will write one for software...  
+
::*ATLIS - http://devweb.acc.jlab.org/CSUEApps/atlis/task/19108
 +
::*HV Calibration John made used at GTS, see fig. 2 https://logbooks.jlab.org/entry/3668182
  
 
;<span style="color:#ff0000">Reconfigure Hall D laser with PM pre-amp in ISB for testing</span>
 
;<span style="color:#ff0000">Reconfigure Hall D laser with PM pre-amp in ISB for testing</span>

Revision as of 13:53, 19 April 2019

Remove Mott dump dipole
Test Vertical Wien filter for PREX spin flip
Measure PQB vs optical pulse shape
Measure chopper focal length vs. radial position
Measure Hall B laser circular polarization
Add HVPS burst disk, charge 60psi, set trip-points
PREX source setup (hel board, laser table, photocathode )
Gun2 photocathode exchange
Heat & activate Gun2 photocathode
Install new anode bias supply controls ISB
Reconfigure Hall D laser with PM pre-amp in ISB for testing
Bias Gun2 anode
Install helicity quad for testing
  • Joe is working on this one...
Injector as-found survey for upgrade
Store Bubble Chamber photon dump