Difference between revisions of "PQB Meeting June 14, 2019"
Jump to navigation
Jump to search
(Created page with "We will meet in TED 2559 Friday June 14 at 9:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone n...") |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
'''Agenda:''' | '''Agenda:''' | ||
− | 1- Injector | + | 1- PQB Setup status [[media:190614_PQB.pptx]] [[media:190614_PQB.pdf]] |
+ | :Start looking at PQB seriously about 4-5 days into receiving beam | ||
+ | 2- Daniel/Paul - Status of Injector Online Parity monitoring | ||
+ | :On-line plots updated ~30 sec pushed to logbook anyone can see, or in MCC w/ Hall A user logging in | ||
+ | 3- Status of PQB feedback PV's | ||
+ | :Feedback plots updated ~10 sec pushed to PV's in archiver once Hall A in production mode | ||
+ | 4- [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18789 Is RTP weekly measurement needed?] | ||
+ | :Not needed routinely, but may ask for occasional check, takes 19.8 minutes | ||
+ | 5- [https://logbooks.jlab.org/entry/3687559 90Hz investigation] | ||
+ | :Root cause not identified, but only presents itself at HWien near -15 deg, will re-check w/ final setup and after spin dance | ||
+ | 6- IHWP in/out updating of RTP PVs | ||
+ | : Joe/Brian/Paul/Caryn to meet, evaluate options A (write/push values using GUI) or B (write directly to RTP cell voltages) |
Latest revision as of 10:36, 14 June 2019
We will meet in TED 2559 Friday June 14 at 9:00 am EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- PQB Setup status media:190614_PQB.pptx media:190614_PQB.pdf
- Start looking at PQB seriously about 4-5 days into receiving beam
2- Daniel/Paul - Status of Injector Online Parity monitoring
- On-line plots updated ~30 sec pushed to logbook anyone can see, or in MCC w/ Hall A user logging in
3- Status of PQB feedback PV's
- Feedback plots updated ~10 sec pushed to PV's in archiver once Hall A in production mode
4- Is RTP weekly measurement needed?
- Not needed routinely, but may ask for occasional check, takes 19.8 minutes
- Root cause not identified, but only presents itself at HWien near -15 deg, will re-check w/ final setup and after spin dance
6- IHWP in/out updating of RTP PVs
- Joe/Brian/Paul/Caryn to meet, evaluate options A (write/push values using GUI) or B (write directly to RTP cell voltages)