Line 8: Line 8:
 
:active temp system (resonance control)
 
:active temp system (resonance control)
  
* From Haipeng [[media:200309_First_calculation.pptx]]
+
* From Haipeng slides pertaining to the 1497 MHz "BCM-style" cavity to be installed in the Prebuncher location as part of the Injector Upgrade (aka UITF Buncher) [[media:Sixth_calculation.pdf]]
 +
 
 +
* From Haipeng slide pertaining to the presently installed 1497 MHz Los Alamos CEBAF Buncher [[media:200309_First_calculation.pptx]]

Latest revision as of 16:17, 20 March 2020

What is needed for 200 kV beam...

  • Reza says we need 4-5x existing power @ 200 keV (limited by 30W) => 135 W
  • From Curt 2/18/20
use new Cu cavity (SS problematic)
buy an amplifier (need a spare)
active temp system (resonance control)
  • From Haipeng slides pertaining to the 1497 MHz "BCM-style" cavity to be installed in the Prebuncher location as part of the Injector Upgrade (aka UITF Buncher) media:Sixth_calculation.pdf