Difference between revisions of "March 20, 2020 - ME/INJ/CIS"
Jump to navigation
Jump to search
(Created page with "== Agenda == ; How to move forward? * let's work through our 'jobs' and see what work can be done at home, what cannot * impacts of delays") |
|||
(25 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | == | + | == Meeting Info == |
− | ; | + | Friday 3/20 @ 10am by bluejeans: https://jlab.bluejeans.com/553225778 |
− | + | ||
− | * | + | == On-Going Jobs == |
+ | ; Let's work through our 'jobs' and see what work can be done at home, what cannot | ||
+ | |||
+ | ; Today's work plan file [[media:200320_AIPINJ_Workplan.xlsx]] | ||
+ | |||
+ | ; ME jobs | ||
+ | * what's the capability to work on the layout at home? and to distribute updated of models to look at? or dimensioned beamlines to use? | ||
+ | * what's the list of ME tasks (design, fabrication, orders) | ||
+ | |||
+ | ; MAG jobs | ||
+ | * PSS kicker | ||
+ | * DS dipole | ||
+ | |||
+ | ;CIS jobs | ||
+ | * list/identify all components needed | ||
+ | * complete purchase reqs | ||
+ | * the Wien filter [https://wiki.jlab.org/ciswiki/index.php/200kV_Wien_filter_-_V3 Wien filter link] | ||
+ | **[[Media:Update from Carlos for AIPINJ meeting March 20 2020.pptx]] | ||
+ | * A1 linear vacuum assembly (motor + encoder or limit switches) | ||
+ | * BPM can assembly | ||
+ | * NEG coating spools/BPM's | ||
+ | |||
+ | ; INJ/CASA jobs | ||
+ | * help finalize final layout | ||
+ | * evaluate layout w/ simulations to list operational settings (solenoids, quads, prebuncher), Wien's off and on | ||
+ | ** Spreadsheet with quad and solenoid settings for various Wien configurations, from elegant: | ||
+ | [[media:magnet_setpoints.ods]] | ||
+ | == Last Meeting's Punchlist == | ||
+ | |||
+ | ; ME | ||
+ | * Danny - Will Frank Marhauser model the BPM design? '''=> Frank said he checked this, the BPM is quite similar to previous ones that I have modelled based on given designs''' | ||
+ | * Alicia - Show a Haimson corrector on spool downstream of first solenoid '''=> done''' | ||
+ | * Joe - Please show UITF style camera assembly on viewer crosses '''=> done''' | ||
+ | * Joe - Do we need a different length spool piece through the two FG solenoids than exists today? => | ||
+ | * Matt - we probably need a new A1 cube (prior one modified for Brock bunchlength monitor) '''=> reqs for new cubes''' | ||
+ | * Alicia - please swap harp w/ valve on last girder before chopper '''=> done''' | ||
+ | * Reza - please put A2 on a cube as well, w/ same type of steering coils '''=> done''' | ||
+ | * Danny - Does A1 full retract? => '''Bottom edge of A1 nominal 0.475" (12mm) out of beam line''' [[media:200320_Aperture1.pdf]] | ||
+ | |||
+ | ; INJ/CASA | ||
+ | * Joe - do you need 200 keV beam for any final checkout tests before we take beam line apart? => | ||
+ | * Joe - is the distance from MFG-A to upstream steering coil sufficient? => | ||
+ | * Matt - decide what power you need in different cavities/locations, work w/ RF to determine regulation needed => | ||
+ | * Riad - will magnetic field of first coil reach photocathode? will it affect solenoids? => '''Field map: [[media:BH_Haimson_Coils.xlsx]]''' | ||
+ | * Joe - do we have all ion pumps and valves per model? => '''Marcy's first pass, but needs to see model again''' [[media:200320_ion pumps and valves.pptx]] | ||
+ | |||
+ | ; CIS | ||
+ | * Matt - Lubricate the stepper motors '''=> added to summer work plans''' | ||
+ | * Matt - Order spare right angle values '''=> ordered +2 in addition to existing 5 in tunnel''' | ||
+ | * Matt - Update on Brock pre-buncher delivery plan '''=> parts due to Jlab by early April, (many fab/testing steps, so probably delays)''' | ||
+ | * Joe - What's dependence of spacing FG's closer? => '''Jay ran the models for 4 or 5 spacings''' |
Latest revision as of 08:18, 2 April 2020
Meeting Info
Friday 3/20 @ 10am by bluejeans: https://jlab.bluejeans.com/553225778
On-Going Jobs
- Let's work through our 'jobs' and see what work can be done at home, what cannot
- Today's work plan file media:200320_AIPINJ_Workplan.xlsx
- ME jobs
- what's the capability to work on the layout at home? and to distribute updated of models to look at? or dimensioned beamlines to use?
- what's the list of ME tasks (design, fabrication, orders)
- MAG jobs
- PSS kicker
- DS dipole
- CIS jobs
- list/identify all components needed
- complete purchase reqs
- the Wien filter Wien filter link
- A1 linear vacuum assembly (motor + encoder or limit switches)
- BPM can assembly
- NEG coating spools/BPM's
- INJ/CASA jobs
- help finalize final layout
- evaluate layout w/ simulations to list operational settings (solenoids, quads, prebuncher), Wien's off and on
- Spreadsheet with quad and solenoid settings for various Wien configurations, from elegant:
Last Meeting's Punchlist
- ME
- Danny - Will Frank Marhauser model the BPM design? => Frank said he checked this, the BPM is quite similar to previous ones that I have modelled based on given designs
- Alicia - Show a Haimson corrector on spool downstream of first solenoid => done
- Joe - Please show UITF style camera assembly on viewer crosses => done
- Joe - Do we need a different length spool piece through the two FG solenoids than exists today? =>
- Matt - we probably need a new A1 cube (prior one modified for Brock bunchlength monitor) => reqs for new cubes
- Alicia - please swap harp w/ valve on last girder before chopper => done
- Reza - please put A2 on a cube as well, w/ same type of steering coils => done
- Danny - Does A1 full retract? => Bottom edge of A1 nominal 0.475" (12mm) out of beam line media:200320_Aperture1.pdf
- INJ/CASA
- Joe - do you need 200 keV beam for any final checkout tests before we take beam line apart? =>
- Joe - is the distance from MFG-A to upstream steering coil sufficient? =>
- Matt - decide what power you need in different cavities/locations, work w/ RF to determine regulation needed =>
- Riad - will magnetic field of first coil reach photocathode? will it affect solenoids? => Field map: media:BH_Haimson_Coils.xlsx
- Joe - do we have all ion pumps and valves per model? => Marcy's first pass, but needs to see model again media:200320_ion pumps and valves.pptx
- CIS
- Matt - Lubricate the stepper motors => added to summer work plans
- Matt - Order spare right angle values => ordered +2 in addition to existing 5 in tunnel
- Matt - Update on Brock pre-buncher delivery plan => parts due to Jlab by early April, (many fab/testing steps, so probably delays)
- Joe - What's dependence of spacing FG's closer? => Jay ran the models for 4 or 5 spacings