Difference between revisions of "CEBAF Injector Upgrade"
Jump to navigation
Jump to search
(36 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
This area is related to Injector Upgrade Meetings | This area is related to Injector Upgrade Meetings | ||
− | = | + | ==Injector upgrade calendar== |
+ | :: Run (now - May 6) | ||
+ | :: Phase 1 (May 6 - end of 2020) | ||
+ | :: Run (Jan 2021 - Sep 13 2021) | ||
+ | :: Phase 2 (Sep 13 - end of 2021) | ||
− | = [[ | + | === [[Injector Upgrade Meetings]] === |
− | = [[Injector | + | === [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABpR9qdRQQGacUVwrDGi9DEw?e=Gb8Y85 Link to AIPINJ OneDrive folder] === |
+ | |||
+ | === [[AIPINJ Layouts]] === | ||
+ | |||
+ | === [[Injector Upgrade Documents and Links]] === | ||
+ | |||
+ | == Components == | ||
+ | ::[[200KV 15 deg dipole]] | ||
+ | ::[[200KV gun BPM's]] | ||
+ | ::[[200kV Wien Filter]] | ||
+ | ::[[Injector Solenoids Upgrade]] | ||
+ | ::[[200kV Quadrupoles]] | ||
+ | ::[[200kV PSS Kicker]] | ||
+ | ::[[200kV Prebuncher]] | ||
+ | ::[[200kV Choppers]] | ||
+ | ::[[Vacuum Upgrades]] | ||
+ | ::[[A1 Aperture Motor Control]] | ||
+ | |||
+ | ==ATLIS Tasks== | ||
+ | === AIPINJ === | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 Injector Camac to Vme and camera upgrade] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 Accelerator network re-survey] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics] | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work] | ||
+ | === Non-AIPINJ === | ||
+ | * [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber] | ||
+ | * Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard |
Revision as of 12:31, 10 April 2020
This area is related to Injector Upgrade Meetings
Injector upgrade calendar
- Run (now - May 6)
- Phase 1 (May 6 - end of 2020)
- Run (Jan 2021 - Sep 13 2021)
- Phase 2 (Sep 13 - end of 2021)
Injector Upgrade Meetings
Link to AIPINJ OneDrive folder
AIPINJ Layouts
Injector Upgrade Documents and Links
Components
ATLIS Tasks
AIPINJ
- Injector Camac to Vme and camera upgrade
- Pedestal Location Surveys
- Install Chopper SSA's
- Chopper SSA LCW
- Penetration Drops
- Testing Wien HV Controls at UITF
- Accelerator network re-survey
- Remove and re-install BPM's Gun to chopper
- Install new IPM2I03
- Remove and calibrate current monitoring electronics
- Harp work
Non-AIPINJ
- New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard