  * Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble
 
  * Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble
 
  Chamber beamline, in the radiator chamber.
 
  Chamber beamline, in the radiator chamber.
 +
 +
* Test Beamline:
 +
  - Need to ask for thermal analysis for the flange radiator to determine the operating beam current.
 +
  - Need to design collimator using GEABNT4.
 +
 +
* Test Schedule:
 +
  - Setup up a first review meeting with Arne and Rolf.

Revision as of 12:36, 6 March 2014

We will meet in TL 2236 on Wednesday March 5 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- Bubble Chamber progress at Argonne

2- Bubble Chamber Schedule at JLab

3- How would the 5D beamline look for the Bubble Chamber test in October 2014?



Notes from this meeting:

* The new chiller has arrived at Argonne
* The Bubble Chamber safety reviews will be completed soon (Pressure System completed, waiting on Mercury Review) and a copy
  will be sent to JLab by the end of March to start the process here.
* Our Budget Request: media:Bubble_FinalCost.pdf media:Bubble_FinalCost.pptx
  - Fast Vale and Dipole Magnet: are approved as part of RSR/SRC.
  - Other expenses: Super Harps, Dumps, ... were included in the ARD/SRC request but not approved yet.
* Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble
Chamber beamline, in the radiator chamber.
* Test Beamline:
  - Need to ask for thermal analysis for the flange radiator to determine the operating beam current.
  - Need to design collimator using GEABNT4.
* Test Schedule:
  - Setup up a first review meeting with Arne and Rolf.