Difference between revisions of "Wednesday March 5, 2014"
Jump to navigation
Jump to search
Line 30: | Line 30: | ||
* Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble | * Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble | ||
Chamber beamline, in the radiator chamber. | Chamber beamline, in the radiator chamber. | ||
+ | |||
+ | * Test Beamline: | ||
+ | - Need to ask for thermal analysis for the flange radiator to determine the operating beam current. | ||
+ | - Need to design collimator using GEABNT4. | ||
+ | |||
+ | * Test Schedule: | ||
+ | - Setup up a first review meeting with Arne and Rolf. |
Revision as of 12:36, 6 March 2014
We will meet in TL 2236 on Wednesday March 5 at 3:00 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- Bubble Chamber progress at Argonne
2- Bubble Chamber Schedule at JLab
3- How would the 5D beamline look for the Bubble Chamber test in October 2014?
Notes from this meeting:
* The new chiller has arrived at Argonne
* The Bubble Chamber safety reviews will be completed soon (Pressure System completed, waiting on Mercury Review) and a copy will be sent to JLab by the end of March to start the process here.
* Our Budget Request: media:Bubble_FinalCost.pdf media:Bubble_FinalCost.pptx - Fast Vale and Dipole Magnet: are approved as part of RSR/SRC. - Other expenses: Super Harps, Dumps, ... were included in the ARD/SRC request but not approved yet.
* Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble Chamber beamline, in the radiator chamber.
* Test Beamline: - Need to ask for thermal analysis for the flange radiator to determine the operating beam current. - Need to design collimator using GEABNT4.
* Test Schedule: - Setup up a first review meeting with Arne and Rolf.