2- Bubble Chamber Schedule at JLab
 
2- Bubble Chamber Schedule at JLab
  
3- How would the 5D beamline look for the Bubble Chamber test in October 2014?
+
3- How would the 5D beamline look for the Bubble Chamber beam test?
 
   
 
   
  
Line 19: Line 19:
 
'''Notes from this meeting:'''
 
'''Notes from this meeting:'''
  
* The new chiller has arrived at Argonne
+
* The new chiller did not arrive at Argonne yet.
  
* The Bubble Chamber safety reviews will be completed soon (Pressure System completed, waiting on Mercury Review) and a copy
+
* The Bubble Chamber safety reviews will be completed soon (Pressure System completed, waiting on Mercury Review) and a copy will be sent to JLab by the end of March to start the process here.
  will be sent to JLab to start the process here.
 
  
* Our Budget Request: [[media:Bubble_FinalCost.pdf]] [[media:Bubble_FinalCost.pptx]]
+
* Our Budget Request: [[media:Bubble_FinalCost.pdf]] [[media:Bubble_FinalCost.pptx]]
   - Fast Vale and Dipole Magnet: are approved as part of RSR/SRC.
+
   - Fast Vale and Dipole Magnet are approved as part of RSR/SRC.
   - Other expenses: Super Harps, Dumps, ... were included in the ARD/SRC request but not approved yet.
+
   - Other expenses (Super Harps, Dumps, ...) were included in the ARD/SRC request but not yet approved.
  
* Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble
+
* Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble Chamber beamline, in the radiator chamber.
Chamber beamline, in the radiator chamber.
+
 
 +
* Test Beamline:
 +
  - Ask for thermal analysis of the flange radiator to determine the operational beam current.
 +
  - Design collimator using GEANT4. Part of the collimator could be positioned inside the pressure vessel. At some point,
 +
    Argonne ordered Cu material that could be available for us.
 +
 
 +
* Test Schedule:
 +
  - Start the '''Experiment Readiness Review''' process with a meeting with Arne and Rolf.

Latest revision as of 12:40, 28 March 2014

We will meet in TL 2236 on Wednesday March 5 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- Bubble Chamber progress at Argonne

2- Bubble Chamber Schedule at JLab

3- How would the 5D beamline look for the Bubble Chamber beam test?



Notes from this meeting:

  • The new chiller did not arrive at Argonne yet.
  • The Bubble Chamber safety reviews will be completed soon (Pressure System completed, waiting on Mercury Review) and a copy will be sent to JLab by the end of March to start the process here.
  - Fast Vale and Dipole Magnet are approved as part of RSR/SRC.
  - Other expenses (Super Harps, Dumps, ...) were included in the ARD/SRC request but not yet approved.
  • Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble Chamber beamline, in the radiator chamber.
  • Test Beamline:
  - Ask for thermal analysis of the flange radiator to determine the operational beam current.
  - Design collimator using GEANT4. Part of the collimator could be positioned inside the pressure vessel. At some point,
    Argonne ordered Cu material that could be available for us.
  • Test Schedule:
  - Start the Experiment Readiness Review process with a meeting with Arne and Rolf.