Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
Line 10: Line 10:
  
 
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
 
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
 +
 +
* LERF Gun High Voltage Conditioning OSP [[Media:LERF gun OSP HV conditioning_80619_signed-off.pdf]]
  
 
;Official documents managed via document-control for CEBAF
 
;Official documents managed via document-control for CEBAF

Revision as of 14:11, 28 September 2020

OSPs, TOSPs and LOSPs for CEBAF

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

Official documents managed via document-control for CEBAF
  • CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
Other documents not managed via document-control
  • SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory