(Created page with "==Work plan for December - January== * Notes: ** LERF is getting its own magnet power supply. We have GTS Gun Solenoid power supply from now on. ** Xelera is in no rush to tak...") |
|||
Line 1: | Line 1: | ||
==Work plan for December - January== | ==Work plan for December - January== | ||
+ | |||
+ | |||
* Notes: | * Notes: | ||
** LERF is getting its own magnet power supply. We have GTS Gun Solenoid power supply from now on. | ** LERF is getting its own magnet power supply. We have GTS Gun Solenoid power supply from now on. | ||
** Xelera is in no rush to take back TGun. Gun will stay at JLab as long as there is use for it. | ** Xelera is in no rush to take back TGun. Gun will stay at JLab as long as there is use for it. | ||
+ | |||
* Plans: | * Plans: | ||
** December: re-connect beamline magnet corrector, PSS certification, re-assemble TGun enclosure | ** December: re-connect beamline magnet corrector, PSS certification, re-assemble TGun enclosure | ||
** January: Beamline magnet racks and trim cards ON. Run 1 mA beam. | ** January: Beamline magnet racks and trim cards ON. Run 1 mA beam. | ||
+ | |||
* Beam Tests (if 1 mA run is successful): | * Beam Tests (if 1 mA run is successful): | ||
** TE011 cavity test | ** TE011 cavity test | ||
** Vent gun HV chamber, remove Kr line, re-activate cathode, ion trapping test. | ** Vent gun HV chamber, remove Kr line, re-activate cathode, ion trapping test. |
Revision as of 10:38, 14 December 2020
Work plan for December - January
- Notes:
- LERF is getting its own magnet power supply. We have GTS Gun Solenoid power supply from now on.
- Xelera is in no rush to take back TGun. Gun will stay at JLab as long as there is use for it.
- Plans:
- December: re-connect beamline magnet corrector, PSS certification, re-assemble TGun enclosure
- January: Beamline magnet racks and trim cards ON. Run 1 mA beam.
- Beam Tests (if 1 mA run is successful):
- TE011 cavity test
- Vent gun HV chamber, remove Kr line, re-activate cathode, ion trapping test.