Difference between revisions of "Bubble Demo ME May 9, 2014"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet Friday May 9 @ 9am in TL-2236. == SUMMER Installation == '''DL Items''' : Are DL drawings signed off? : Identify vendor for DL? : Identify vendor for DL alignment...")
 
Line 8: Line 8:
  
 
'''Beamline layout'''
 
'''Beamline layout'''
 +
: Part list
 +
* re-use from tunnel
 +
* on shelf
 +
* buy part
 +
* design/fab part
 
: Bellows arrangement
 
: Bellows arrangement
 
: Modify support of "green" girder
 
: Modify support of "green" girder
Line 13: Line 18:
 
: Aluminum photon dump dimensions
 
: Aluminum photon dump dimensions
  
Beamline components
+
'''Beamline components'''
 
: Are MBH corrector strengths sufficient?
 
: Are MBH corrector strengths sufficient?
 +
: Is radiator cooling flange sufficient?
  
Bubble Chamber Alignment
+
'''Bubble Chamber Alignment'''
 
: Mounting in tunnel
 
: Mounting in tunnel
 
: Chamber alignment capability
 
: Chamber alignment capability

Revision as of 15:20, 1 May 2014

We will meet Friday May 9 @ 9am in TL-2236.

SUMMER Installation

DL Items

Are DL drawings signed off?
Identify vendor for DL?
Identify vendor for DL alignment plate?

Beamline layout

Part list
  • re-use from tunnel
  • on shelf
  • buy part
  • design/fab part
Bellows arrangement
Modify support of "green" girder
Plan/schedule for drawings and fabrication
Aluminum photon dump dimensions

Beamline components

Are MBH corrector strengths sufficient?
Is radiator cooling flange sufficient?

Bubble Chamber Alignment

Mounting in tunnel
Chamber alignment capability

FINAL installation

Identify suitable dump dipole and its dimensions