(Created page with "We will meet Friday May 9 @ 9am in TL-2236. == SUMMER Installation == '''DL Items''' : Are DL drawings signed off? : Identify vendor for DL? : Identify vendor for DL alignment...") |
|||
Line 8: | Line 8: | ||
'''Beamline layout''' | '''Beamline layout''' | ||
+ | : Part list | ||
+ | * re-use from tunnel | ||
+ | * on shelf | ||
+ | * buy part | ||
+ | * design/fab part | ||
: Bellows arrangement | : Bellows arrangement | ||
: Modify support of "green" girder | : Modify support of "green" girder | ||
Line 13: | Line 18: | ||
: Aluminum photon dump dimensions | : Aluminum photon dump dimensions | ||
− | Beamline components | + | '''Beamline components''' |
: Are MBH corrector strengths sufficient? | : Are MBH corrector strengths sufficient? | ||
+ | : Is radiator cooling flange sufficient? | ||
− | Bubble Chamber Alignment | + | '''Bubble Chamber Alignment''' |
: Mounting in tunnel | : Mounting in tunnel | ||
: Chamber alignment capability | : Chamber alignment capability |
Revision as of 15:20, 1 May 2014
We will meet Friday May 9 @ 9am in TL-2236.
SUMMER Installation
DL Items
- Are DL drawings signed off?
- Identify vendor for DL?
- Identify vendor for DL alignment plate?
Beamline layout
- Part list
- re-use from tunnel
- on shelf
- buy part
- design/fab part
- Bellows arrangement
- Modify support of "green" girder
- Plan/schedule for drawings and fabrication
- Aluminum photon dump dimensions
Beamline components
- Are MBH corrector strengths sufficient?
- Is radiator cooling flange sufficient?
Bubble Chamber Alignment
- Mounting in tunnel
- Chamber alignment capability
FINAL installation
- Identify suitable dump dipole and its dimensions