== SUMMER Installation ==
 
== SUMMER Installation ==
 
'''DL Items'''
 
'''DL Items'''
: Are DL drawings signed off?
+
: (Shaun/Joe) Are DL drawings signed off?
: Identify vendor for DL?   
+
: (Tim/Joe) Identify vendor for DL?   
: Identify vendor for DL alignment plate?
+
: (Tim/Joe/Shaun) Identify vendor for DL alignment plate?
  
 
'''Beamline layout'''
 
'''Beamline layout'''
: Part list
+
: (Joe/Shaun) Part list
 
:: re-use from tunnel
 
:: re-use from tunnel
 
:: on shelf
 
:: on shelf
 
:: buy part
 
:: buy part
 
:: design/fab part
 
:: design/fab part
: Bellows arrangement
+
: (Shaun) Bellows arrangement
: Modify support of "green" girder
+
: (Shaun) Modify support of "green" girder
: Plan/schedule for drawings and fabrication
+
: (Shaun) Plan/schedule for drawings and fabrication
: Aluminum photon dump dimensions
+
: (Riad) Aluminum photon dump dimensions
  
 
'''Beamline components'''
 
'''Beamline components'''
: Are MBH corrector strengths sufficient?
+
: (Joe) Are MBH corrector strengths sufficient?
: Is radiator cooling flange sufficient?
+
: (Joe M.) Is radiator cooling flange sufficient?
  
 
'''Bubble Chamber Alignment'''
 
'''Bubble Chamber Alignment'''
: Mounting in tunnel
+
: (Riad/Brad/Shaun) Mounting in tunnel
: Chamber alignment capability
+
: (Riad/Brad/Shaun) Chamber alignment capability
  
 
== FINAL installation ==
 
== FINAL installation ==
 
: Identify suitable dump dipole and its dimensions
 
: Identify suitable dump dipole and its dimensions

Revision as of 15:23, 1 May 2014

We will meet Friday May 9 @ 9am in TL-2236.

SUMMER Installation

DL Items

(Shaun/Joe) Are DL drawings signed off?
(Tim/Joe) Identify vendor for DL?
(Tim/Joe/Shaun) Identify vendor for DL alignment plate?

Beamline layout

(Joe/Shaun) Part list
re-use from tunnel
on shelf
buy part
design/fab part
(Shaun) Bellows arrangement
(Shaun) Modify support of "green" girder
(Shaun) Plan/schedule for drawings and fabrication
(Riad) Aluminum photon dump dimensions

Beamline components

(Joe) Are MBH corrector strengths sufficient?
(Joe M.) Is radiator cooling flange sufficient?

Bubble Chamber Alignment

(Riad/Brad/Shaun) Mounting in tunnel
(Riad/Brad/Shaun) Chamber alignment capability

FINAL installation

Identify suitable dump dipole and its dimensions