Difference between revisions of "Bubble Demo ME May 9, 2014"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
'''Beamline layout''' | '''Beamline layout''' | ||
− | : (Joe) | + | : (Shaun) Send Joe copy of layout |
+ | : (Joe) Parts list | ||
:: re-use from tunnel | :: re-use from tunnel | ||
:: on shelf | :: on shelf |
Revision as of 15:26, 1 May 2014
We will meet Friday May 9 @ 9am in TL-2236.
SUMMER Installation
DL Items
- (Shaun/Joe) Finalize/sign drawings
- (Tim) Identify vendor for DL?
- (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate
Beamline layout
- (Shaun) Send Joe copy of layout
- (Joe) Parts list
- re-use from tunnel
- on shelf
- buy part
- design/fab part
- (Shaun) Bellows arrangement
- (Shaun) Modify support of "green" girder
- (Shaun) Plan/schedule for drawings and fabrication
- (Riad) Aluminum photon dump dimensions
Beamline components
- (Joe) Are MBH corrector strengths sufficient?
- (Joe M.) Is radiator cooling flange sufficient?
Bubble Chamber Alignment
- (Riad/Brad/Shaun) Mounting in tunnel
- (Riad/Brad/Shaun) Chamber alignment capability
FINAL installation
- Identify suitable dump dipole and its dimensions