* [https://logbooks.jlab.org/entry/3884311 BPMs connections good - save iocipmm904 removal - iocipmm901 installed in its place]
 
* [https://logbooks.jlab.org/entry/3884311 BPMs connections good - save iocipmm904 removal - iocipmm901 installed in its place]
 
* [https://logbooks.jlab.org/entry/3885222 Nomenclature for elements disseminated and labelled]
 
* [https://logbooks.jlab.org/entry/3885222 Nomenclature for elements disseminated and labelled]
* Raster installation - completed; turned over to Bill Gunning
+
* Raster installation - [https://logbooks.jlab.org/entry/3885536 completed]; per Bill Gunning. (Thanks!) Also, thank you for software and channel access integration by Weiwei & Brian!
 
* Install target mechanism (Completed), [https://logbooks.jlab.org/entry/3884440 motor controls tested] - Survey required
 
* Install target mechanism (Completed), [https://logbooks.jlab.org/entry/3884440 motor controls tested] - Survey required
 +
* [https://logbooks.jlab.org/entry/3885411 6GHz] > 1.5GHz Down-converter installed for bunch length system
 +
* [https://logbooks.jlab.org/entry/3885781 Insertables APP undated] with new installation (Thanks Scott!); iocitf2 rebooted.
 +
 
* Build 80/20 support structure for Pb (Completed)
 
* Build 80/20 support structure for Pb (Completed)
 +
* Ready to install Al base plates for FC3 region rework as well as solenoid stand. [https://logbooks.jlab.org/entry/3883262 80/20 reworked for support]
 
* Pb stacked; some modification possibly required. RCG/ME discussing.
 
* Pb stacked; some modification possibly required. RCG/ME discussing.
 
* EES work happening in earnest  
 
* EES work happening in earnest  
* Ready to install Al base plates for FC3 region rework as well as solenoid stand. [https://logbooks.jlab.org/entry/3883262 80/20 reworked for support]
 
 
* [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]]
 
* [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]]
 +
  
 
Gun work progressing well:
 
Gun work progressing well:
 
* [https://logbooks.jlab.org/entry/3884328 Gun/Depo chamber bake started] and [https://logbooks.jlab.org/entry/3885376 completed]
 
* [https://logbooks.jlab.org/entry/3884328 Gun/Depo chamber bake started] and [https://logbooks.jlab.org/entry/3885376 completed]
 
+
* [https://logbooks.jlab.org/entry/3885738 Gun HVPS tank topped to 60 psig SF6]; [https://logbooks.jlab.org/entry/3885748 NF3 charged] as well
 +
* [https://logbooks.jlab.org/entry/3885740 R30 resistor installed for gun HV processing]
 +
* [https://logbooks.jlab.org/entry/3885787 Gun anode picoammeter connected]
 +
* [https://logbooks.jlab.org/entry/3885764 Decarad probes placed] for gun
 +
* [https://logbooks.jlab.org/entry/3886422 MDSK201 interlock] in gun HVPS bypassed for HV commissioning (See [https://logbooks.jlab.org/entry/3886643 ABIL5170])
 +
* [https://logbooks.jlab.org/entry/3886430 Steel puck in place]
 +
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1663 Gun HV Processing] under way (UITFList 1663); up to [https://logbooks.jlab.org/entry/3886789 182kV] so far
 
* [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule]
 
* [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule]
  

Revision as of 07:20, 21 July 2021

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/984025598.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 984025598.
  3. To join via phone, use one of the following numbers and the Conference ID: 984025598.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Long Term Schedule: Gantt (Outstanding tasks)

  1. 7/26/21 Start Hot Check-out


New items for discussion:

Short term schedule update:
This week:


Gun work progressing well:

Still to do:

  • Add Mu metal over bellows on wastewater line.


Next Week:

  • Mount bottle rack in Labyrinth (Staged); remove gas bottles to rack.
  • Unistrut mounting for cables - Neal will do when available
  • Engineering work on beam line starting

2 weeks:

  • Pull Heliax from Spectrum analyzer/Control room >> Buncher
  • 4th terminal system in Control room under assembly/rebuild
  • Items from To-do list...

Engineering Other business

Reports on Open Action Items:

Action Items: