Difference between revisions of "2021-07-21"

From Ciswikidb
Jump to navigation Jump to search
Line 29: Line 29:
 
* [https://logbooks.jlab.org/entry/3885411 6GHz] > 1.5GHz Down-converter installed for bunch length system
 
* [https://logbooks.jlab.org/entry/3885411 6GHz] > 1.5GHz Down-converter installed for bunch length system
 
* [https://logbooks.jlab.org/entry/3885781 Insertables APP undated] with new installation (Thanks Scott!); iocitf2 rebooted.
 
* [https://logbooks.jlab.org/entry/3885781 Insertables APP undated] with new installation (Thanks Scott!); iocitf2 rebooted.
 
 
* Build 80/20 support structure for Pb (Completed)
 
* Build 80/20 support structure for Pb (Completed)
 
* Ready to install Al base plates for FC3 region rework as well as solenoid stand. [https://logbooks.jlab.org/entry/3883262 80/20 reworked for support]
 
* Ready to install Al base plates for FC3 region rework as well as solenoid stand. [https://logbooks.jlab.org/entry/3883262 80/20 reworked for support]
 
* Pb stacked; RCG required modification due to permanent shielding req delay.  
 
* Pb stacked; RCG required modification due to permanent shielding req delay.  
 
* New designs for [[media:FC3-SHIELDING_20JUL21v1.pdf|FC3]] and [[media:FC4-SHIELDING_20JUL21v1.pdf|FC4]] with a great many thanks to Shaun for the design work and John/Xi for Pb arrangement and table construction!
 
* New designs for [[media:FC3-SHIELDING_20JUL21v1.pdf|FC3]] and [[media:FC4-SHIELDING_20JUL21v1.pdf|FC4]] with a great many thanks to Shaun for the design work and John/Xi for Pb arrangement and table construction!
 +
* [[media:JL0029599-2000UITF_MeV_BEAMLINE07-JUN-21.pdf|Songsheet]] being updated by Shaun; be sure to let him know when changes are made!
 
* EES work happening in earnest  
 
* EES work happening in earnest  
 
* [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]]
 
* [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]]

Revision as of 07:37, 21 July 2021

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/984025598.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 984025598.
  3. To join via phone, use one of the following numbers and the Conference ID: 984025598.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Long Term Schedule: Gantt (Outstanding tasks)

  1. 7/26/21 Start Hot Check-out


New items for discussion:

Short term schedule update:
This week:


Gun work progressing well:

Still to do:

  • Add Mu metal over bellows on wastewater line.


Next Week:

  • Mount bottle rack in Labyrinth (Staged); remove gas bottles to rack.
  • Unistrut mounting for cables - Neal will do when available
  • Engineering work on beam line starting

2 weeks:

  • Pull Heliax from Spectrum analyzer/Control room >> Buncher
  • 4th terminal system in Control room under assembly/rebuild
  • Items from To-do list...

Engineering Other business

Reports on Open Action Items:

Action Items:

Back to Main Meeting Minutes Page