(Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
 
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
 
==== <u>Schedule</u> ====
 
==== <u>Schedule</u> ====
 
Long Term Schedule: [[Media:WW-Install_6.22.21.pdf|Gantt]] ([[Media:WW-ToDo_6.22.21.pdf|Outstanding tasks]])
 
Long Term Schedule: [[Media:WW-Install_6.22.21.pdf|Gantt]] ([[Media:WW-ToDo_6.22.21.pdf|Outstanding tasks]])
# 7/26/21 Start Hot Check-out
+
# 8/9/21 Start Hot Check-out
 
 
 
 
  
 
==== <u>New items for discussion:</u> ====
 
==== <u>New items for discussion:</u> ====
Line 25: Line 23:
 
assed for HV commissioning (See [https://logbooks.jlab.org/entry/3886643 ABIL5170])
 
assed for HV commissioning (See [https://logbooks.jlab.org/entry/3886643 ABIL5170])
 
# [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1663 Gun HV Processing] under way (UITFList 1663); up to [https://logbooks.jlab.org/entry/3886789 182kV] so far
 
# [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1663 Gun HV Processing] under way (UITFList 1663); up to [https://logbooks.jlab.org/entry/3886789 182kV] so far
# HV/Kr processing in progress
+
# HV/Kr processing in progress: Processed to 235 kV in Kr; evaluating in vacuum now.
 
# [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule]
 
# [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule]
  

Latest revision as of 08:03, 28 July 2021

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/984025598.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 984025598.
  3. To join via phone, use one of the following numbers and the Conference ID: 984025598.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Long Term Schedule: Gantt (Outstanding tasks)

  1. 8/9/21 Start Hot Check-out

New items for discussion:

Short term schedule update:
This week:

Reports by Group: CIS/EGG: assed for HV commissioning (See ABIL5170)

  1. Gun HV Processing under way (UITFList 1663); up to 182kV so far
  2. HV/Kr processing in progress: Processed to 235 kV in Kr; evaluating in vacuum now.
  3. Gun rebuild schedule

DC Power:

  1. Corrector installation & cable reroute mostly complete, turned over to DC power
  2. Chris Gould making nomenclature changes / Gary Croke & Michele Joyce making controls changes / Eric Forman to update Quick Reference Drawing / Shaun to take care of song sheets
  3. Changes made in UED workspace for names and field maps; ready to merge soon. (Thanks Gary!)
  4. Solenoid PS being installed

Instrumentation and Controls:

  1. BCM project software integration under way between Musson/Seaton and Sue Witherspoon
  2. Chris Norris to hook up viewers next week.
  3. Brian Freeman available for adViewer work for video camera for ITVM604A; some focusing still required.

RF:

  1. 6GHz > 1.5GHz Down-converter installed for bunch length system

Vacuum:


SSG:

  1. BLM locations being set 7/21 following this meeting
  2. FSD inputs for magnet and BCM being prepared

ME / Installation:

  1. Pb stacked; RCG required modification due to permanent shielding req delay.
  2. New designs for FC3 and FC4 with a great many thanks to Shaun for the design work and John/Xi for Pb arrangement and table construction!
  3. Songsheet being updated by Shaun; be sure to let him know when changes are made!
  4. Status of permanent shielding purchase?

Experiment:

  • COO/ESAD/RSAD prepared; committee response in progress.

Other:

Still to do:

  • Add Mu metal over bellows on wastewater line.


Next Week:

  • Mount bottle rack in Labyrinth (Staged); remove gas bottles to rack.
  • Unistrut mounting for cables - Neal will do when available
  • Engineering work on beam line starting

2 weeks:

  • Pull Heliax from Spectrum analyzer/Control room >> Buncher
  • 4th terminal system in Control room under assembly/rebuild
  • Items from To-do list...

Engineering Other business

Reports on Open Action Items:

Action Items: