Difference between revisions of "AIPINJ - Layouts"

From Ciswikidb
Jump to navigation Jump to search
 
(22 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Injector quick reference drawing ==
+
== Injector Quick Reference ==
* Pre-Upgrade (April 2020) injector quick reference : [[media:12GeV_injector_quick_reference_rev16.pdf]]
+
* Injector Quick Reference Drawing, Rev17 [[media:12GeV_injector_quick_reference_rev17_final.pdf]]
* Updated (Feb '21) Inj Quick Reference, Rev17beta, Draft 2 [[media:12GeV injector quick reference rev17 DRAFT-2.pdf]]
 
  
==Phase 1 - Songsheet ==
+
* Jun 7, 2021 - Injector Quick reference, Rev17beta, Draft 6 [[media:12GeV_injector_quick_reference_rev17_DRAFT-6.pdf]]
* Feb 18, 2021 - Preliminary songsheet update [[media:210218_ACC0002845-0001, INJECTOR, REV C.pdf]]
+
** Jun 21, 2021 [[Tunnel Photos of Phase I Upgrade]]
:VIP2I01A => VIP2I00A
+
 
:VIP2I01B => VIP2I00B
+
* Apr 19, 2021 - Injector Quick reference, Rev17beta, Draft 5 [[media:12GeV_injector_quick_reference_rev17_DRAFT-5.pdf]]
:VIP2I01C => VIP2I00C
+
* Mar 29, 2021 - Injector Quick Reference, Rev17beta, Draft 4 [[media:12GeV_injector_quick_reference_rev17_DRAFT-4.pdf]]
:VIP2I01 => VIP2I00
+
* Mar 05, 2021 - Injector Quick Reference, Rev17beta, Draft 3 [[media:12GeV_injector_quick_reference_rev17_DRAFT-3.pdf]]
:ILL2I01DCANO => ILL2I00DCANO
+
* Feb 19, 2021 - Injector Quick Reference, Rev17beta, Draft 2 [[media:12GeV injector quick reference rev17 DRAFT-2.pdf]]
:VGP0I01 => VGP0I01A
+
* Feb 12, 2021 - Injector Quick Reference, Rev17beta, Draft 1 [[media:12GeV_injector_quick_reference_rev17_DRAFT-1.pdf]]
* Feb 1, 2021 - Preliminary songsheet release [[media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf]]
+
* Apr 01, 2020 - Injector Quick Reference, Pre-AIPINJ Upgrade [[media:12GeV_injector_quick_reference_rev16.pdf]]
  
==Phase 1 - CED Layout Info ==
+
==Phase 1 - CED Info ==
 +
* Mar 05, 2021 - Please refer to published version of CED [[AIPINJ - CED]]
 
* Jan 27, 2021 - [[media:210127_AIPINJ_CED_v2.xlsx]] Row "D" shows edit for songsheet
 
* Jan 27, 2021 - [[media:210127_AIPINJ_CED_v2.xlsx]] Row "D" shows edit for songsheet
 
* Sep 14, 2020 - [[media:200914_AIPINJ_CED.xlsx]] Final, updated CED list (checked DM/JG/AH/MS)
 
* Sep 14, 2020 - [[media:200914_AIPINJ_CED.xlsx]] Final, updated CED list (checked DM/JG/AH/MS)
Line 19: Line 19:
 
* Aug 31, 2020 - Rev 6 [[media:200831_AIPINJ_layout_rev6.xlsx]]  Preliminary list and component comparison
 
* Aug 31, 2020 - Rev 6 [[media:200831_AIPINJ_layout_rev6.xlsx]]  Preliminary list and component comparison
  
==Phase 1 - Gun to Chopper Layouts==
+
==Phase 1 - ME Songsheets ==
 +
* Feb 23, 2021 - Preliminary songsheet update [[media:210223_ACC0002845-0001, INJECTOR, REV C.pdf]]
 +
* Feb 18, 2021 - Preliminary songsheet update [[media:210218_ACC0002845-0001, INJECTOR, REV C.pdf]]
 +
* Feb 01, 2021 - Preliminary songsheet release [[media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf]]
 +
 
 +
== Phase 1 - ME Released Drawings ==
 +
*SECTION 1 => M:\me-group\2020 INJECTOR BEAMLINE\2020 Injector Beamline Arrangements\JL0091130-0100, SECTION 01\00-RELEASED DRAWINGS
 +
*SECTION 2 => M:\me-group\2020 INJECTOR BEAMLINE\2020 Injector Beamline Arrangements\JL0091130-0200, SECTION 02\00-RELEASED DRAWINGS
 +
*SECTION 3 => M:\me-group\2020 INJECTOR BEAMLINE\2020 Injector Beamline Arrangements\JL0091130-0300, SECTION 03\00-RELEASED DRAWINGS
 +
 
 +
==Phase 1 - ME Design Layouts==
 
* Sep 14, 2020 [[media:beamlinelayoutsep10.pdf]] Final, updated layout (checked DM/JG/AH/MS)
 
* Sep 14, 2020 [[media:beamlinelayoutsep10.pdf]] Final, updated layout (checked DM/JG/AH/MS)
 
* Aug 27, 2020 [[media:beamlinelayoutaug27.pdf]] Preliminary Phase 1 layout
 
* Aug 27, 2020 [[media:beamlinelayoutaug27.pdf]] Preliminary Phase 1 layout
Line 28: Line 38:
 
* Mar 09, 2020 [[media:BEAMLINELAYOUTMAR09.pdf]] 90% complete layout; note bellows on A1/A2 girder
 
* Mar 09, 2020 [[media:BEAMLINELAYOUTMAR09.pdf]] 90% complete layout; note bellows on A1/A2 girder
 
* Feb 26, 2020 [[media:BEAMLINELAYOUTFEB26.pdf]] edits post ME meeting, small corrections
 
* Feb 26, 2020 [[media:BEAMLINELAYOUTFEB26.pdf]] edits post ME meeting, small corrections
:-sequence just before the gun valve goes like this if possible:  bellows + bpm/corr + valve.
 
:-remove the pink rectangular placeholders for quadrupoles
 
:-sequence after Vertical Wien:  viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
 
:-restore gap between the FG solenoids as exists in tunnel today
 
:-sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
 
:-if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
 
 
* Feb 07, 2020 [[media:beamlinelayoutfeb07.pdf]] edits post ME meeting, small corrections
 
* Feb 07, 2020 [[media:beamlinelayoutfeb07.pdf]] edits post ME meeting, small corrections
 
* Feb 04, 2020 [[media:BEAMLINELAYOUTFEB04.pdf]] edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
 
* Feb 04, 2020 [[media:BEAMLINELAYOUTFEB04.pdf]] edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
Line 42: Line 46:
 
* Jun 13, 2019 [[media:190613_guntochopper.pdf]]
 
* Jun 13, 2019 [[media:190613_guntochopper.pdf]]
  
==Phase 2 - Booster Layouts==
+
==Phase 2 - ME Design Layouts==
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
* Sep 26, 2019 [[media:190926_boosterregion.pdf]]
 
* Sep 26, 2019 [[media:190926_boosterregion.pdf]]
Line 52: Line 56:
 
* June 10, 2019 [[media:190610_layoutjune10.pdf]]
 
* June 10, 2019 [[media:190610_layoutjune10.pdf]]
  
==Overall Phase 1 & 2 AIPINJ Layouts==
+
==Overall Phase 1 & 2 - ME Design Layouts==
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
* July 19, 2019 [[media:keytotaljuly19.pdf]]
 
* July 19, 2019 [[media:keytotaljuly19.pdf]]
 
* July 17, 2019 [[media:keytotaljuly17.pdf]]
 
* July 17, 2019 [[media:keytotaljuly17.pdf]]

Latest revision as of 16:05, 21 March 2022

Injector Quick Reference

Phase 1 - CED Info

Phase 1 - ME Songsheets

Phase 1 - ME Released Drawings

  • SECTION 1 => M:\me-group\2020 INJECTOR BEAMLINE\2020 Injector Beamline Arrangements\JL0091130-0100, SECTION 01\00-RELEASED DRAWINGS
  • SECTION 2 => M:\me-group\2020 INJECTOR BEAMLINE\2020 Injector Beamline Arrangements\JL0091130-0200, SECTION 02\00-RELEASED DRAWINGS
  • SECTION 3 => M:\me-group\2020 INJECTOR BEAMLINE\2020 Injector Beamline Arrangements\JL0091130-0300, SECTION 03\00-RELEASED DRAWINGS

Phase 1 - ME Design Layouts

Phase 2 - ME Design Layouts

Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.

-QCM was .32" further downstream. so all those interfaces moved.
-distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
-buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
-YAO cavity was .37" longer than the design drawing.

Overall Phase 1 & 2 - ME Design Layouts

Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.