Difference between revisions of "Meeting 9/15/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 4: Line 4:
  
 
== Readiness Updates ==
 
== Readiness Updates ==
 +
 +
* Tour of installation so far [[media:220914_COMTRA.pptx]]
  
 
* ME/Layout
 
* ME/Layout
Line 11: Line 13:
  
 
* Experiment components
 
* Experiment components
** collimator installed and alignment
+
** collimator installed and aligned
 
** magnet measurement, status for install
 
** magnet measurement, status for install
 
** detector assembly, fiducialization
 
** detector assembly, fiducialization
Line 23: Line 25:
  
 
* DAQ/Controls
 
* DAQ/Controls
 +
** Helicity generator
 +
** High Voltage
 +
** EFADC/DAQ
 +
** Kepco PS
 +
 +
* Experiment sequence
 +
** Pre-Beam - complete HCO, magnet ready, assembly detector ready, fiducial them, mock-up install ?, remove temporarily
 +
** Commission - setup beam to FCUP, APERTURE, DUMP and use x-ray card to define orbit to collimator
 +
** Experiment - install/align magnet/detector (w/ attenuators?), deliver x-rays, optimize DAQ, measure asymmetry vs. XYZ and with Wien
 +
  
 
== Older Links==
 
== Older Links==

Latest revision as of 18:40, 14 September 2022

Thursday's @ 9am EDT by Zoom

Readiness Updates

  • ME/Layout
    • updated songsheet and quick reference, matching UED
    • dimensions when needed for S&A or Greg's Geant4 model
    • RadCon approval for lead wall, and experiment hut
  • Experiment components
    • collimator installed and aligned
    • magnet measurement, status for install
    • detector assembly, fiducialization
  • I&C jobs
    • Remote motion control for aperture (otherwise do by hand w/ access)
    • Attach current monitors to aperture and dump
    • Plumb LCW for current monitor and dump
    • Pull 6 fibers from DAQ to mezzanine
    • Align x-ray camera for x-ray card after collimator
  • DAQ/Controls
    • Helicity generator
    • High Voltage
    • EFADC/DAQ
    • Kepco PS
  • Experiment sequence
    • Pre-Beam - complete HCO, magnet ready, assembly detector ready, fiducial them, mock-up install ?, remove temporarily
    • Commission - setup beam to FCUP, APERTURE, DUMP and use x-ray card to define orbit to collimator
    • Experiment - install/align magnet/detector (w/ attenuators?), deliver x-rays, optimize DAQ, measure asymmetry vs. XYZ and with Wien


Older Links