Difference between revisions of "Meeting 9/22/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
(Created page with ";Thursday's @ 9am EDT by Zoom * Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09 * Zoom ID: 160 190 6056 and Passcode: 992...")
 
 
(4 intermediate revisions by the same user not shown)
Line 28: Line 28:
 
** Attach current monitors to aperture and dump => done
 
** Attach current monitors to aperture and dump => done
 
** Plumb LCW for current monitor and dump => done 0.75 gpm, SSG update FSD text
 
** Plumb LCW for current monitor and dump => done 0.75 gpm, SSG update FSD text
** Pull 6 fibers from DAQ to mezzanine => not yet
+
** Pull 6 fibers from DAQ to mezzanine (fibers arrived) => to be done today
 
** Align x-ray camera for x-ray card after collimator => ?
 
** Align x-ray camera for x-ray card after collimator => ?
 
** Insertable 1/2-waveplate => Shukui needs help
 
** Insertable 1/2-waveplate => Shukui needs help
** pull Heliax to gun rack => done, cable #10
+
** pull Triax to gun rack (BCM Receiver) => done, cable #10
  
 
* DAQ/Controls
 
* DAQ/Controls
 
** Helicity generator
 
** Helicity generator
** High Voltage
+
** High Voltage => tested, ready
 
** EFADC/DAQ
 
** EFADC/DAQ
 
** Kepco PS
 
** Kepco PS

Latest revision as of 07:59, 22 September 2022

Thursday's @ 9am EDT by Zoom

Experiment Time!!!

Readiness Updates

  • ME/Layout
    • Mike/Eric completed quick reference (done, see above)
    • Songsheet => use quick reference above
    • Matt working with SCMB & RadCon (100 nA shielded hut, 25 nA unshielded hut)
  • Experiment components
    • collimator installed and aligned => see above
    • magnet measurement => status...
    • detector assembly, fiducialization => walkthrough completed wit
  • I&C jobs
    • Remote motion control for aperture (otherwise do by hand w/ access) => done
    • Attach current monitors to aperture and dump => done
    • Plumb LCW for current monitor and dump => done 0.75 gpm, SSG update FSD text
    • Pull 6 fibers from DAQ to mezzanine (fibers arrived) => to be done today
    • Align x-ray camera for x-ray card after collimator => ?
    • Insertable 1/2-waveplate => Shukui needs help
    • pull Triax to gun rack (BCM Receiver) => done, cable #10
  • DAQ/Controls
    • Helicity generator
    • High Voltage => tested, ready
    • EFADC/DAQ
    • Kepco PS