Difference between revisions of "MOLLER PQB Meeting February 21, 2024"

From Ciswikidb
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
'''Agenda:'''  
 
'''Agenda:'''  
  
1- Took parity DAQ runs with every pattern to confirm pattern sequence. Checked patterns and delays with beam. Analysis underway.
+
1- Parity DAQ runs with every pattern to confirm pattern sequence. Checked patterns and delays with beam (Arindam Sen): [[media:beam_study_asen.pdf]]
  
 
2- Initial data to study correlation with K-Long charge asymmetry - Repeat with more statistics. Need to do SCL measurements with Hall D laser.  
 
2- Initial data to study correlation with K-Long charge asymmetry - Repeat with more statistics. Need to do SCL measurements with Hall D laser.  
  
3- BCM Receiver tests update.
+
3- Two major MOLLER beam studies in April:
 
+
# FFB in Hall A: we want to start Hall A April run with FFB ON. Then, we will need 1-shift of beam studies to the hall at helicity flip of 2 kHz. We will also measure monitor resolution (new bpms, bcms).
4- FFB plan in Hall A
+
# K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.
 
 
5- K-Long SRF loading beam test
 

Latest revision as of 15:54, 21 February 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Parity DAQ runs with every pattern to confirm pattern sequence. Checked patterns and delays with beam (Arindam Sen): media:beam_study_asen.pdf

2- Initial data to study correlation with K-Long charge asymmetry - Repeat with more statistics. Need to do SCL measurements with Hall D laser.

3- Two major MOLLER beam studies in April:

  1. FFB in Hall A: we want to start Hall A April run with FFB ON. Then, we will need 1-shift of beam studies to the hall at helicity flip of 2 kHz. We will also measure monitor resolution (new bpms, bcms).
  2. K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.